EWT G20 Owner's Manual page 29

Table of Contents

Advertisement

REPLACE DRAIN LINE FLOW CONTROL
REPLACE BRINE LINE FLOW CONTROL
BLFC
Retainer
REPLACE MOTOR
2 X Screws
1. Follow steps 1 to 3 of Timer /Powerhead replacement.
2. Remove the two screws from the motor. Remove motor( disconnect the wire attached on PCB if any), watch
for the pin under the motor.
3. Replace the motor.
DLFC
Copper Fitting
1. Screw the copper tting out.
2. Remove the retainer out.
3. Clean/replace the BLFC button.
Motor
1. Pull the drain line clip and remove the
drain line elbow and washer.
2. Clean/replace drain line ow control .

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EWT G20 and is the answer not in the manual?

Related Products for EWT EWT G20

Table of Contents