Test Operation - Panasonic DH-3RL1 Operating Instructions Manual

Electric home shower
Table of Contents

Advertisement

Available languages

Available languages

6. How to fix the Front Plate
① Make sure the Main Switch Knob and the Power
Control Knob on Front Plate and it is at "Off" position.
Main Switch Knob and Power Control Knob
② Make sure the "D-Cut" position of the Rotary Shaft and
VR Shaft are located as shown.
"D-Cut"
Position
7. Shower Hanger Installation
Mount the Shower Hanger on the wall with 2 Screws.
Drive each Screws into the 2 Wall Plugs through the screw holes.
Make sure the Shower Head top is not higher than the Unit top when installing the Shower Hanger.
Shower Hanger

3. TEST OPERATION

1. • Before switch "ON" electricity supply, please check the electrical wiring connection to the Unit.
• Switch "ON" the Miniature Circuit Breaker (MCB) and ON/OFF DP (double pole) Switch.
• Set the ELB of the Unit to "On". (Push up the ELB Reset Lever if it is down)
• Push the ELB Test Button.
• It is normal if the ELB turns "Off" (the ELB Reset Lever falls) push the ELB Reset Lever up.
Refer figure as shown.
• Inspect the built-in ELB (once a month) to avoid a hazard to users such as damage to property, serious
injury or death.
If the ELB Reset Lever cannot be reset even if you push it up or if it soon slides down
during operation, please do not use the Unit and contact the authorized dealer
immediately to avoid a hazard to users such as damage to property, serious injury or
death. Never fix the ELB Reset Lever forcibly with tape and such.
2. • Turn "ON" the Main Water Valve.
• Turn the Water Volume Knob clockwise and water will flow out from the Shower Head.
• Check if water leaks from Pipe Line.
3. • Turn the Main Switch Knob "On" (ELB lamp will lights).
• Turn the Power Control Knob clockwise and hot water will flow out from the Shower Head.
(Adjust to suitable water temperature).
4. • Refer detail for HOW TO USE and WATER FLOW RATE ADJUSTMENT on page 15.
Front Plate
ELB
Off
High
Off
On
WARNING
L(+)
(-)N
MUST BE TIGHTEN
Screw
Wall Plug
WARNING
- 21 -
③ Close the Front Plate of the Unit according to the sequence
as illustrated.
④ Push in the Main Switch Knob and Power Control Knob
until it is fully inserted
<Main Switch Knob and Power Control Knob can not be
inserted if Step (1) and Step (2) is not done accordingly>
⑤ Fix the screw at the bottom of the Unit.
Note:
• Do not push the ELB Test Button during fixing the Front
Plate.
• Do not apply extreme force to insert the Main Switch Knob
and Power Control Knob during fixing the Front Plate
because it will damage the switch inside the Unit.
Front Plate
Back Plate
Press
Press
Press
Shower Hanger
Screw
Shower Head
Screw
ELB
Off
High
ELB Test
Off
On
OFF
MAX
FILTER
CLEANING
ELB
ELB
Test Button
Off
High
ELB Test
Off
On
ELB Reset
Push Up
DH-3RL1
OFF
ELB
MAX
FILTER
CLEANING
Reset Lever
Push

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Dh-3rp1

Table of Contents