Space$aver
Global Foodservice Solutions
™
Figure 6: Position of the T-piece
Figure 7: Parts of the T-piece
1
Sealing ring
2
Threaded connector
3
Metal ring
1. Check that both sealing rings (1) are lying flat in the threaded
connectors (2).
2. Screw the threaded connectors (2) evenly onto the hard and soft
water connections and tighten securely. Avoid cross-threading.
Planning and installation instructions
Water
1
2
3
31