Airflow Requirements - NCR RealPOS 60 Site Preparation Manual

Hide thumbs Also See for RealPOS 60:
Table of Contents

Advertisement

NCR RealPOS 60 Terminal Site Preparation
29

Airflow Requirements

Do not block the air vents on the terminal or peripherals. These vents are necessary for
cooling.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7601

Table of Contents