Installing Input and Output Cables / 安装输入输出线缆
NOTE / 说明
1.
Cables can be routed in and out from the top or bottom. The example in the figure illustrates cables routed in and out
from the top. The ground terminal is identified by a
sign.
进出线方式为上下进出线;图中接线以上进上出为例。接地端子以
标志标识。
2.
The colors of the power cables for your reference. The local cable color standards prevail.
线缆颜色仅供参考,请以当地电源线缆标准为准。
3.
Grey shaded area for wiring area.
灰色阴影区域为接线区域。
Install the input cables. 安装输入线缆。
1.
Front view of power distribution box
配电箱前视图
2.
Install the output power cables. 安装输出线缆。
Front view of power distribution box
配电箱前视图
4
3.
Install the signal cables. 安装信号线缆。
Front view of power distribution box
配电箱前视图
NOTE / 说明
For the definitions of wiring terminal blocks, see the Schematic Diagram delivered with the product.
接线端子排定义参见随机附带的原理图。
7
Checking After Installation / 安装后检查
After the installation is completed, verify the items in the following tables before power-on.
安装完成后,在上电前,请根据下表内容进行检查。检查合格后方可进行上电操作。
Electrical connection checklist / 电气连接检查
7.1
No. /
Check That / 检查项
编号
All cables are correctly connected based on the Schematic Diagram.
1
参考原理图,检查所有接线是否正确。
Ground cables are securely connected.
2
检查地线是否已连接牢靠。
Redundant parts of the ground cables and power cables are cut off instead of coiled.
3
电源线、地线的余长应被剪除,不能盘绕。
Phase cables are connected properly.
4
各相位连线正确。
Power cables and ground cables are routed and bundled separately from other types of cables.
5
电源线、地线在布放时应与其他电缆分开绑扎。
All circuit breakers are OFF.
6
所有空开处于"OFF"状态。
5
Hardware installation checklist / 硬件安装检查
7.2
No. /
Check That / 检查项
编号
The box is clean, without dust or sundries.
1
配电箱清洁干净,无灰尘、污物,箱内无杂物。
The paint on the cabinet exterior is intact. If paint flakes off, repaint that area immediately to avoid corrosion.
2
外部漆饰应完好,如有掉漆,立即补漆,以防止腐蚀。
The box door and lock work properly.
3
箱门开闭灵活,门锁正常。
All labels are correct, clear, and complete.
4
各种安全警告标识正确、清晰、齐全。
The surrounding area of the box contains no waste tape, cable ties, paper, or packing materials.
5
配电箱周围不得有胶带、扎带线头、纸屑和包装袋等施工遗留物。
Cable installation checklist / 线缆安装检查
7.3
No. /
Check That / 检查项
编号
All bolts are tightened, especially the bolts used for electrical connection. Flat washers and spring washers are
1
installed properly in the correct sequence.
所有螺栓都要拧紧(尤其要注意电气连接部分),平垫、弹垫要齐全,且不能装反。
Cables are bundled neatly, and cable ties are secured evenly and properly in the same direction.
2
电缆绑扎应整齐美观,线扣间距均匀,松紧适度,朝向一致。
Cables are routed for ease of future maintenance and expansion.
3
电缆布放应便于维护和将来扩容。
There is no unnecessary adhesive tape or cable tie on the cables.
4
线缆上无多余胶带、扎带等遗留。
Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing.
5
接线端子处的裸线及线鼻柄应用绝缘胶带缠紧,或套热缩套管,不得外露。
The power and signal cables are routed in accordance with the weak- and strong-current cable routing
6
specifications and the cable routing plan.
电源线走线和监控线走线满足强弱电走线要求,符合系统走线规划。
8
Powering On and Commissioning / 上电调测
Use the handle to switch on and off the ATS manually for one to three times and ensure that no mechanical jams occur
during switching. For details, see the ATS documents.
上电前用手柄分合ATS开关1~3次,确保ATS主、备触头切换时无机械卡塞现象。详情请参见ATS相关资料。
1.
Switch on the upper-level circuit breaker and ATS. The indicators turn on.
合上前级电源空开和ATS,配电箱电源指示灯点亮。
2.
Switch on SPD circuit breakers, and check the SPD status.
闭合防雷空开,检查防雷器工作状态。
3.
Check that all parameters of the input smart electricity meter are normal. Then switch on all circuit breakers in
sequence, and check that the output voltage of each loop by using a multimeter.
检查智能电力仪表显示是否正常。若正常,逐一合上所有空开,用万用表检测回路输出电压是否正常。
4.
After the check, switch off all circuit breakers in sequence, and disconnect the power supply.
确认正常后,依次断开所有空开,再断开电源。
This guide is for reference only. The actual product prevails.
本指南仅供参考,内容如有改动,请以实物为准。
6
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People's Republic of China
www.huawei.com
华为技术有限公司
深圳市龙岗区坂田华为总部办公楼
邮编:518129
www.huawei.com
4008302118

Advertisement

loading