Commissioning Checklist - Mitsubishi Electric Ecodan HUS210FTC4ST Installation Manual

Pre-plumbed cylinder with ftc4 control system
Table of Contents

Advertisement

Commissioning Checklist

35
Mains Pressure Hot Water Storage System
This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the
appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturers
instructions may invalidate the warranty but does not affect your statutory rights.
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certificate will the be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
www. centralheating.co.uk
FTC4 Installation Manual
81