Check List For Installation - Philips UrbanSpark Mounting Instructions

Table of Contents

Advertisement

Check List for Installation

(This checklist MUST be signed by the installer before system installation handover)
Project Name
Scope of check
Site Consrtuctor
No. Item
Installation
1
location
2 Base
3 Anchor bolts
4 Products
5 Bolts
6 Wiring
Fixing of PV
7
Cartridge with
Pole
8 Work status
9 Luminaire
10 PV panel
Charger
11
configuration
Person in charge of site construction
Description
If the installation location avoid the
shade of the trees or buildings
If structural strength of base meet
local pole specification
If the anchor bolts location
dimensions follow the MI
If all components no damaged
If four bolts are fixed
If the wiring is done as per the
instruction
If all the screws are are properly
tightened and rubber bolt cover are
placed over.
If the work status comply to the
request
If the luminaire can light on
If the PV panel can charge the
battery normally.
If the the charger is configured as
per the customer requirement.
Project Location
Result
□ yes
□ yes
□ yes
□ yes
□ yes
□ yes
□ yes
□ yes
□ yes
□ yes
□ yes
10
Remark
□ No
□ No
□ No
□ No
□ No
□ No
□ No
□ No
□ No
□ No
□ No
Signature/Date

Advertisement

Table of Contents
loading

Table of Contents