Buckleys PHD PRO2 Quick Start Manual

Buckleys PHD PRO2 Quick Start Manual

High-voltage dc pinhole/porosity detector kit
Hide thumbs Also See for PHD PRO2:

Advertisement

Quick Links

High-voltage DC pinhole/porosity detector kit
Quick Start Guide
Please read this manual before using the equipment
5830-0046 11/21 │ English

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PHD PRO2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Buckleys PHD PRO2

  • Page 1 High-voltage DC pinhole/porosity detector kit Quick Start Guide Please read this manual before using the equipment 5830-0046 11/21 │ English...
  • Page 2: Table Of Contents

    Quick Start Guide Contents Safety Warnings ................................3 EC Declaration of Conformity ............................. 4 UKCA Declaration of Conformity ..........................4 Specifications ................................4 Maintenance ................................5 Register Your Product ..............................5 Useful Advice ................................5 Kit Contents ................................... 6 Risk Assessment ................................7 Factory Settings ................................
  • Page 3: Safety Warnings

    - the user must ensure adequate ventilation so that established workplace exposure limits are not exceeded. Safety Warning: DO NOT USE this equipment in the event of it being immersed in water. It must be immediately returned to Buckleys for service, calibration and/or repair.
  • Page 4: Ec Declaration Of Conformity

    Quick Start Guide EC Declaration of Conformity We, Buckleys (UVRAL) Ltd., as sole manufacturer of the apparatus listed below, declare that the product PHD Pro2 is manufactured in conformity with the following directives: 2014/30/EU, 2014/35/EU and 2015/863/EU. Date: 01/07/2021 Authorised by: J P Hoveman CEO, Buckleys (UVRAL) Ltd.
  • Page 5: Maintenance

    Maintenance The PHD Pro2 is designed for minimum maintenance by the user, however the following periodic checks/actions are recommended: The exterior of the unit should be cleaned Our service team will ensure your detector’s regularly. Stubborn dirt may be removed with a...
  • Page 6: Kit Contents

    Quick Start Guide Kit Contents Upon delivery of your PHD Pro2, please take the time to ensure that the kit is complete, and all components shown below are present and undamaged: PHD Pro2 PHD Pro2 PHD Pro Item Description Basic Kit...
  • Page 7: Risk Assessment

    Factory Settings In order to use the PHD Pro2, you will need to adjust the instrument settings to suit your specific application – see page 9. The following is a summary of the settings as set in the factory:...
  • Page 8: Setup

    Quick Start Guide Setup...
  • Page 9 The user should establish, in conjunction with their client, and having regard for the material being tested, appropriate test conditions to be applied. In the absence of a customer specification, Buckleys has found NACE SP0274 to be a useful general- purpose standard, however, it remains the user’s responsibility to establish safe and reliable testing conditions.
  • Page 10: Basic Testing

    Quick Start Guide Basic Testing Press and hold the ON button...
  • Page 11 Basic Testing (continued)
  • Page 12: Contact Details

    Contact Details Manufacturer Distributor Buckleys (UVRAL) Ltd. Address Buckleys House Unit G, Concept Court, Shearway Business Park, Shearway Road Folkestone, Kent CT19 4RG, UK Tel: +44 (0)1303 278888 Email: sales@buckleys.co.uk www.buckleysinternational.com www.buckleysinternational.com 5830-0046 – 11/21 │ English...