FusionSolar Smart PV Management System
Connection
User Manual (Inverters + SDongleA)
Step 7 Click Next. On the displayed Electric Price Configuration tab page, set the date
range, time period, and electricity price.
Figure 5-14 Adding time-based prices
Step 8 Click Next to go to the Other Information tab page. Set other information about
the PV plant, including Plant image, Address, Start time of safe running, Plant
introduction, and Plant time zone of the PV plant. Start time of safe running
refers to the day when the PV plant starts to generate electricity normally. It is
mainly used to calculate the safe running days of the PV plant.
Issue 02 (2021-11-25)
Figure 5-13 Verifying the number of PV strings and the string capacity
NO TE
If Batch Configuration is selected, the capacity of other PV strings to be configured is
automatically set to the same value as PV1 after PV1 capacity is configured.
NO TE
● Click Add to add a date range. Multiple date ranges cannot overlap and must cover a
full year.
● Click
to add a time period and price. Multiple time periods cannot overlap and must
cover a full year.
● Click Delete to delete a time-based price.
● Click
to delete a date range.
Copyright © Huawei Technologies Co., Ltd.
5 Site Deployment and Commissioning
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sdonglea-03Sdonglea-05

Table of Contents