FusionSolar Smart PV Management System
Connection
User Manual (Inverters + SDongleA)
Parameter
Contact Person
Contact method
Step 5 On the Access Device tab page, set the connected devices for the PV plant.
1.
Step 6 Click Next to go to the String Configuration tab page.
1.
2.
Issue 02 (2021-11-25)
Manually enter the SN of the Smart Dongle and click the blank area of
Device type. The system automatically displays the device name and model.
The affiliated inverters and power meter are automatically added. Click + on
the left of the SN to expand the device information. (The + icon becomes the
– icon after the information is expanded.) Then, check whether the connected
devices are correct.
Figure 5-11 Entering the device SN
Fill Total plant string capacity (kWp) (Total rated active power of the plant
generator set) as required. In the device list, select one or more devices to be
configured and click String Capacity Configuration. The String Capacity
Configuration dialog box is displayed.
Figure 5-12 String capacity configuration
Verify the number of PV strings and the string capacity, and click OK.
Copyright © Huawei Technologies Co., Ltd.
5 Site Deployment and Commissioning
Description
PV plant contact who facilitates problem handling.
You are advised to set this parameter.
Contact information which facilitates problem
handling. You are advised to set this parameter.
31