Select And Install Ductwork; Converting Horizontal Discharge Units To Downflow (Vertical) Discharge; Provide For Condensate Disposal - Carrier 50JS Installation, Start-Up And Service Instructions Manual

Single-package heat pump units
Table of Contents

Advertisement

5. Tighten the tension buckle until it is taut. Lifting brackets
must be secure in the handholds.
6. Attach field-supplied clevis or hook of sufficient strength to
hole in the lifting bracket (See Fig. 8).
7. Attach the 2 safety straps directly to the clevis or hook at the
4 rigging brackets. DO NOT attach the safety straps to the
lifting brackets (See Fig. 8).
"A"
"B"
INSTALL SAFETY STRAPS TO
RIGGING CLEVIS AT 4 RIGGING BRACKETS
PLACE RIGGING BRACKET ASSEMBLY IN 4
HAND HOLES AND INSTALL TIE DOWN STRAP
AROUND PERIMETER OF UNIT AND THROUGH
SPACE IN BRACKET ASSEMBLY
SEE DETAIL A
UNIT
MAXIMUM WEIGHT
Size
lb.
kg.
50JS018
305
138.4
50JS024
311
141.1
50JS030
309
140.2
50JS036
313
142.0
50JS042
345
156.4
50JS048
375
170.1
50JS060
440
199.6
50JX024
321
145.6
50JX030
342
155.2
50JX036
350
158.8
50JX042
372
168.8
50JX048
377
171.0
50JX060
450
204.2
Fig. 8—Suggested Rigging
8. Position lifting point directly over the unit's center of gravity.
9. Lift unit. When unit is directly over the roof curb, remove the
2 safety straps. Lower the equipment onto the roof curb.
Step 5—Select and Install Ductwork
The design and installation of the duct system must be in
accordance with the standards of the NFPA for installation of
non-residence type air conditioning and ventilating systems, NFPA
90A or residence-type, NFPA 90B and/or local codes and ordi-
nances.
Select and size ductwork, supply-air registers, and return air grilles
according to ASHRAE (American Society of Heating, Refrigera-
tion, and Air Conditioning Engineers) recommendations.
The unit has duct flanges on the supply- and return-air openings on
the side of the unit.
When designing and installing ductwork, consider the following:
914-137"
(36"-54")
DETAIL A
SCALE 0.250
TIGHTEN STRAPPING SECURELY
WITH TENSION BUCKLE
C99075
A
B
in.
mm.
in.
mm.
19.5
495.3
16.75
425.5
18.5
469.9
16.75
425.5
19.5
495.3
17.50
444.5
19.5
495.3
17.75
450.9
19.5
495.3
17.75
450.9
20.5
520.7
20.62
523.8
19.5
495.3
19.75
501.7
19.0
482.6
18.25
463.6
20.0
508
19.25
489
20.0
508
19.0
482.6
21.0
533.4
20.5
520.7
20.0
508
21.25
539.8
21.0
533.4
20.0
508.0
For vertical supply and return units, tools or parts could drop
into ductwork and cause serious injury or death. Install a 90
degree turn in the return ductwork between the unit and the
conditioned space. If a 90 degree elbow cannot be installed,
then a grille of sufficient strength and density should be
installed to prevent objects from falling into the conditioned
space. Units with electric heaters require 90 degree elbow in
supply duct.
1. All units should have field-supplied filters or accessory filter
rack installed in the return-air side of the unit. Recommended
sizes for filters are shown in Tables 1A and 1B.
2. Avoid abrupt duct size increases and reductions. Abrupt
change in duct size adversely affects air performance.
IMPORTANT: Use flexible connectors between ductwork and
unit to prevent transmission of vibration. Use suitable gaskets to
ensure weather tight and airtight seal. When electric heat is
installed, use fireproof canvas (or similar heat resistant material)
connector between ductwork and unit discharge connection. If
flexible duct is used, insert a sheet metal sleeve inside duct. Heat
resistant duct connector (or sheet metal sleeve) must extend 24-in.
from electric heater element.
3. Size ductwork for cooling air quantity (cfm). The minimum
air quantity for proper electric heater operation is listed in
Tables 2A and 2B. Heater limit switches may trip at air
quantities below those recommended.
4. Seal, insulate and weatherproof all external ductwork. Seal,
insulate and cover with a vapor barrier all ductwork passing
through conditioned spaces. Follow latest Sheet Metal and Air
Conditioning Contractors National Association (SMACNA)
and Air Conditioning Contractors Association (ACCA) mini-
mum installation standards for residential heating and air
conditioning systems.
5. Secure all ducts to building structure. Flash,weatherproof, and
vibration-isolate duct openings in wall or roof according to
good construction practices.
CONVERTING HORIZONTAL DISCHARGE UNITS TO
DOWNFLOW (VERTICAL) DISCHARGE UNITS
Before performing service or maintenance operations on
system, turn off main power to unit. Turn off accessory heater
power switch if applicable. Electrical shock could cause
serious injury or death.
1. Open all electrical disconnects before starting any service
work.
2. Remove side duct covers to access bottom return and supply
knock outs.
3. Use a screwdriver and hammer to remove the panels in the
bottom of the base pan.
4. Reinstall the side duct covers to block off the horizontal air
openings.
NOTE: These panels are held in place with tabs similar to an
electrical knockout.
NOTE: Avoid abrupt duct size increases and reductions. Abrupt
change in duct size adversely affects air performance.
Step 6—Provide for Condensate Disposal
NOTE: Ensure that condensate-water disposal methods comply
with local codes, restrictions, and practices.
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50js018-06050jx018-060Jx018-060

Table of Contents