Periodic Inspection And Maintenance - Raynor ControlHoist 2.0 Standard Installation Instructions And User Manual

Hide thumbs Also See for ControlHoist 2.0 Standard:
Table of Contents

Advertisement

PERIODIC INSPECTION AND MAINTENANCE

Your Raynor electric door operator was designed to give dependable service with a minimum amount of maintenance.
After proper installation and adjustment, by a qualified installer, little is required in the way of maintenance except for
periodic inspection and lubrication as follows:
LUBRICATION
All Raynor operators are supplied with continuous rated
motors and under normal conditions require no oiling.
INSPECTION AND ADJUSTMENTS
WARNING: Repairs and adjustments to the
door or operator should only be made
by a qualified door installer.
1.
Inspect and tighten (if necessary) all bolts and nuts.
2.
Periodically check that all labels shown on page 18
are installed. If labels are missing, contact your nearest
Raynor dealer.
3.
Adjust clutch as shown in Fig. 7, if necessary.
Adjustment may be required after a short break-in
period.
4.
If necessary, adjust limit nuts as described in Fig. 6.
5.
Check V-belt for wear and replace if necessary. Also
check V-belt tension (about 1/2 inch deflection when ap-
plying pressure with finger). Adjust tension by loosening
motor bolts and moving motor toward the rear of the
operator.
5793130-12
6.
Check manual operation of door. Refer to
installation instructions 800, page 5972558-1
for guidelines.
7.
Test all reversing devices once a month for proper
operation.
8.
Test all accessories that may have been supplied with
the operator to ensure they are working properly.
CAUTION:Do not reset overload until problem
is identified. Damage to door and operator or
personal injury could result if cause of tripping
is not corrected.
9. Manual Reset Overload:
sized, at the factory, for normal door operation. If over-
load trips, manually check mechanical operation of door
and operator to be certain both work freely.
Single Phase:
When overload trips, it cuts power to the
entire unit. To reset, press reset button on outside of
control box.
Three Phase:
When overload trips, it cuts power to the
24 volt control circuit only. To reset, open control box
cover and press red reset button.
The overload is properly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CsjCsh

Table of Contents