AS OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT
YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT.
Site survey:
1. Carry out a survey of the area where the Slide will be located, and check for any
overhead/underground cables. It's important that this is carried out to avoid ground
anchors penetrating underground services, and the Slide coming into contact with
overhead cables when inflated.
2. You should provide an adequate power supply to the fan, this should adhere to
your local power regulations.
3. Check wind speed: The industry recommends a maximum wind speed of Force 5
on the Beaufort scale of 28 - 38 kmph (19-24 mph). Force 5 is a fresh breeze when
small trees in leaf begin to sway.
Included with your Slide:
The Structure
in its bag
Extra equipment needed in addition what is supplied with your inflatable:
• Suitable 240v Power Supply to operate the fan
CAUTION!
prevent electric shock. The blower requires a Ground Fault Protected Circuit
(GFCI). Please read the manufacturer's Instruction Manual before using the blower(s).
Extra equipment you could consider for your new inflatable:
• Ground sheet to protect the underside of your inflatable
• Sandbag covers to anchor your inflatable indoors
8M Platform Slide
IMPORTANT
The Slide
Land Operation
in its bag
Manual
Precautions should be taken during handling and use of the product to
Anchor Pegs
Repair Kit
Page 1 of 5
Anchoring
Straps
4
X
Need help?
Do you have a question about the 8M Platform Slide and is the answer not in the manual?
Questions and answers