9.2.
Checking of SMPS Module
Step 1 Remove Top Cabinet.
Step 2 Remove SMPS Module.
Step 3 Place SMPS Module on the insulated material.
Step 4 Attach 13P Cable at the connector (CON2) on SMPS
Module.
Step 5 SMPS Module can be checked as diagram shown.
9.3.
Checking of Main P.C.B.
Step 1 Remove Top Cabinet.
Step 2 Remove Main P.C.B..
Step 3 Place Main P.C.B. on the insulated material as shown.
Step 4 Attach 30P FFC at the connector (CN2506) on Main
P.C.B..
Step 5 Attach 16P FFC at the connector (CN2505) on Main
P.C.B..
Step 6 Attach 10P FFC at the connector (P5101) on Main
P.C.B..
Step 7 Attach 24P FFC at the connector (P5001) on Main
P.C.B..
Step 8 Attach 13P Cable at the connector (CON2) on SMPS
Module.
Step 9 Main P.C.B. can be checked as diagram shown.
37