Download Print this page

IDEAL APP SPEC Pak Assembly Instructions page 2

Advertisement

Step 5 Block Powerpole
Orient Powerpole
housings with hoods up (See Figure 4)
®
Block Powerpole
housings by interlocking dove tails to create individual rows (See Figure 5)
®
If more than one row is required, block rows together by interlocking dove tails
Step 6 Insert Powerpole
With Hood up, slide Powerpole
right side, aligning the holder posts with the grove in Powerpole
Orient the remaining holder half with
Slide remaining half into the assembly, inserting the holder posts into the Powerpole
grove and aligning the tongues and grooves on the holder halves
Step 7 Install Crimped Signal Contacts into the Connector Housings
Orient the insert holder with the
Snap the crimped signal contacts into the appropriate holes in the back of the holder
halves (See Figure 7). A tactile snap will be felt when contact is latched.
Repeat until all signal contacts have been installed into the housing
Step 8 Install Crimped Power Contacts into the Connector Housings
Orient the insert holder with the
Insert crimped power contacts into the appropriate Powerpole
contact lip snaps over the edge of the spring (See Figure 8)
Repeat until all power contacts have been installed
Step 9 Install insert holder into the Inline Receptacle shell
Prior to inserting the holder into the receptacle shell, create 2" (50.8 mm) of slack in
the signal wires, if applicable. Hint: To maintain the proper amount of slack with the
wires, temporarily tape wires together
Verify that the o-ring is properly seated in the receptacle shell
Secure insert holder to the Inline Receptacle by tightening the screws in an
alternating manner. Torque: 13 in-lb (1.4 N-M) (See Figure 9)
Step 10 Secure Sealing Nut on Gland
Hand tighten until snug.
Stabilize sealing gland body (from step 3) with a spanner or crescent wrench
(see Figure 10).
Tighten additional ½ - ¾ turn using a second spanner or crescent wrench.
Caution: Do NOT over tighten the sealing gland body to the shell.
Figure 8
Figure 9
All Data Subject To Change Without Notice
"SPEC Pak, Powerpole, Anderson Power Products, APP & A, are registered trademarks of Anderson Power Products"
HEADQUARTERS: Anderson Power Products®, 13 Pratts Junction Road, Sterling, MA 01564-2305 USA T:978-422-3600 F:978-422-0128 • EUROPE: Anderson Power Products® Ltd., Unit 3, Europa
Court, Europa Boulevard, Westbrook, Warrington, Cheshire, WA5 7TN United Kingdom T: +44 (0) 1925 428390 F: +44 (0) 1925 520203 • ASIA / PACIFIC: IDEAL Anderson Asia Pacific Ltd., Unit 922-928
Topsail Plaza, 11 On Sum Street, Shatin N.T., Hong Kong T:+(852) 2636 0836 F:+(852) 2635 9036 • CHINA: IDEAL Anderson Technologies (Shenzhen) Ltd., Block A8 Tantou Western Industrial Park,
Songgang Baoan District, Shenzhen, PR. China 518105 T: +(86) 755 2768 2118 F: +(86) 755 2768 2218 • TAIWAN: IDEAL Anderson Asia Pacific Ltd., Taiwan Branch, 4F.-2, No.116, Dadun 20th St., Situn
District, Taichung City 407, Taiwan (R.O.C.) T: +(886) 4 2310 6451 F:+(886) 4 2310 6460 •
SPEC Pak
housing together
®
block into Powerpole
®
block into the holder half marked with
®
on the right side (See Figure 6)
to the right
to the right
High Power Inline Receptacle
®
Page 2
Holder
®
on the
(See Figure 6)
®
®
housing until the
®
www.andersonpower.com
Hood Up
Figure 4
Correct
Figure 5
Figure 6
Sockets
Figure 7
Figure 10
Hood Down
Incorrect
Suggested Hood
Orientation for Plug
Grove
Pins
Signal Pin & Socket
15661
1S6554 REV 03

Advertisement

loading