Download Print this page

Ergo PrimeCables Cab-PC-08164 Installation Manual

Advertisement

Quick Links

Technical data
3
Column qty
Max. Weight
150KG
Capacity
Height Range
580-1230mm
1100-1900mm
Width Range
1260-1860mm
Component list
Qty No.
Qty
No.
Part
Part
1
3
2
3
Feet
Lifting Column
Qty No.
Qty
No.
Part
Part
3
2
4
1
Cable Management
Supporting Beam
Qty No.
Qty
No.
Part
Part
3
5
6
1
Supporting plate
Auxiliary beam
Qty No.
Qty
No.
Part
Part
7
1
8
1
Hand Switch
Control Box
Qty No.
Qty
No.
Part
Part
9
10
1
1
Power cable
Cable
Item No.: Cab-PC-08165
Installation guide
Accessory list
Attention: The drawings below are only for reference which might be slightly
different from the actual object, please in kind prevail. Any tools missing or
installation problems, please contact the customer service firstly.
Image
Spec
No.
A
M6
B
M6
C
M6
D
M6
E
St4.2
Wrench
F
4x4mm
5
6
8
3
2
9
10
1
STEP 1
Install supporting beam(4)
D
x12
F
4x4
F
D
Qty
6
8
Install lifting column (2)and supporting beam (4)
together, use wrench (F) to tighten the screws (D).
12
16
STEP 2
Install feet (1)
24
1
C
x12
F
C
F
4x4
2
Install
Auxiliary beam
STEP 3
Supporting plate
F
A
A
x6
7
F
4x4
Install auxiliary beam(5)
2
4
Install lifting column (2) and auxiliary beam (5)
together, use wrench (F) to tighten the screws(D).
1
1
4
Install feet (1) and lifting column (2) together, use
wrench (F) to tighten the screws (C).
(5) and
6
(6)
5
4
Buckle in the auxiliary beam (5) to the supporting
beam (4), and the specific position can be selected
according to the tabletop.
F
2
D
5
F
C
2
5

Advertisement

loading
Need help?

Need help?

Do you have a question about the PrimeCables Cab-PC-08164 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ergo PrimeCables Cab-PC-08164

  • Page 1 STEP 1 Install supporting beam(4) Install auxiliary beam(5) Item No.: Cab-PC-08165 Installation guide Accessory list Attention: The drawings below are only for reference which might be slightly different from the actual object, please in kind prevail. Any tools missing or installation problems, please contact the customer service firstly.
  • Page 2 STEP 4 STEP 6-B Install the Cable Management Tray (3) Connect All the Cables onto the Way 2 Control Box(8) Power port Port for cable connected to the Port for lifting column hand switch H S M 1M2 The cable management tray (3) should be mounted on the middle connecting rod when The Installation of cable management the frame is stretched more than 1720 mm.