Using And Programming Schedules - Daikin Altherma 3 H F User Reference Manual

Hide thumbs Also See for Altherma 3 H F:
Table of Contents

Advertisement

4 Operation
2 Select the correct gas price.
3 Confirm the changes.
INFORMATION
Price value ranging from 0.00~990  valuta/kWh (with 2
significant values).
To set the electricity price
1 Go to [7.5.1]/[7.5.2]/[7.5.3]: User settings >
Electricity price > High/Medium/Low.
2 Select the correct electricity price.
3 Confirm the changes.
4 Repeat this for all three electricity prices.
INFORMATION
Price value ranging from 0.00~990  valuta/kWh (with 2
significant values).
INFORMATION
If no schedule is set, the Electricity price for High is
taken into account.
To set the electricity price schedule timer
1 Go to [7.5.4]: User settings > Electricity
price > Schedule.
2 Program the selection using the scheduling screen.
You can set the High, Medium and Low electricity
prices according to your electricity supplier.
3 Confirm the changes.
INFORMATION
The values correspond with the electricity price values for
High, Medium and Low previously set. If no schedule is set,
the electricity price for High is taken into account.
About energy prices in case of an incentive per
kWh renewable energy
An incentive can be taken into account when setting the energy
prices. Although the running cost can increase, the total operation
cost, taking into account the reimbursement will be optimized.
NOTICE
Make sure to modify the setting of the energy prices at the
end of the incentive period.
To set the gas price in case of an incentive per kWh renewable
energy
Calculate the value for the gas price with the following formula:
▪ Actual gas price+(Incentive/kWh×0.9)
For the procedure to set the gas price, see
price" [ 4  13].
To set the electricity price in case of an incentive per kWh
renewable energy
Calculate the value for the electricity price with following formula:
▪ Actual electricity price+Incentive/kWh
For the procedure to set the electricity price, see
price" [ 4  14].
electricity
Example
This is an example and the prices and/or values used in this
example are NOT accurate.
Data
Gas price
Electricity price
User reference guide
14
"To set the gas
"To set the
Price/kWh
4.08
12.49
Data
Renewable heat incentive per
kWh
Calculation of the gas price
Gas price=Actual gas price+(Incentive/kWh×0.9)
Gas price=4.08+(5×0.9)
Gas price=8.58
Calculation of the electricity price
Electricity price=Actual electricity price+Incentive/kWh
Electricity price=12.49+5
Electricity price=17.49
Price
Gas: 4.08 /kWh
Electricity: 12.49 /kWh
4.7.3

Using and programming schedules

About schedules
Depending on your system layout and installer configuration,
schedules for multiple controls may be available.
You can...
Set if a specific control needs to act
according to a schedule.
Select which schedule you currently want to use for a specific
control. The system contains some predefined schedules. You can:
Consult which schedule is currently
selected.
Select another schedule if needed.
Program your own schedules if the
predefined schedules are not
satisfactory. The actions you can
program are control specific.
To select which schedule you currently want to use
1 Go to the schedule for the specific control.
See "Schedule/Control" in
schedules" [ 4  15].
Example: For the schedule for the desired room
temperature in heating mode, go to [1.2] Room >
Heating schedule.
2 Select the name of the current schedule.
User defined 1
Mon
Tue
Wed
Thu
Fri
Sat
Sun
3 Select Select.
Delete
Rename
Select
4 Select the schedule that you currently want to use.
Price/kWh
5
Value in breadcrumb
[7.6]=8.6
[7.5.1]=17
See...
"Activation screen" in
schedules" [ 4  15]
"Possible
"Schedule/Control" in
schedules" [ 4  15]
"Possible
"To select which schedule
you currently want to
use" [ 4  14]
▪ "Possible
actions"
"Possible
schedules" [ 4  15]
"4.7.4  Schedule screen:
Example" [ 4  15]
"Possible
EAVZ16S18+23DA6V(7)+9W
Daikin Altherma 3 H F
4P556076-1A – 2021.09
in

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eavz16s18da6v7Eavz16s23da6v7Eavz16s18da9wEavz16s23da9w

Table of Contents