b. Mark and disconnect transformer wires and remove existing transformer.
c. Install replacement transformer from kit (refer to
(1) For models APD, UDAP, UDAS, UDX, UDZ, UEAS, UEZ, and VR, secure transformer (5) using same screws.
(2) For models F and B, slide Tinnerman clips (2A) over transformer (5) and secure transformer using screws
(2) from kit.
(3) Reconnect transformer wires.
d. Install or close panel(s) as necessary.
3. Install relay assembly on control unit and on all non-control units (see
MODELS APD, APD, UBX, UBZ, UDAP, UDAS, UDBP,
UDBS, UDX, UDZ, UEAS, AND UEZ
3
1
1A
MODELS F AND B
1
1A
a. For models APD, APD, UBX, UBZ, UDAP, UDAS, UDBP, UDBS, UDX, UDZ, UEAS, and UEZ:
(1) At rear of heater, remove screws from edge of cabinet bottom.
(2) Secure relay assembly (1 and 1A) and cable clamp (3) as shown using existing screws for unit sizes 030–125
or one existing screw and one screw (2) from kit for unit sizes 150–400 and all UEAS and UEZ models.
4
INSTALLATION—CONTINUED
Table
2
3
Figure 2. Relay Installation (Refer to
2):
Figure
MODEL LAPD
1
1A
MODEL VR
2A
1
1A
Table
2)
2):
4
2A
2
2
3
OPT-CL31-CL32 (11-21) 102247-A
Need help?
Do you have a question about the APD and is the answer not in the manual?