Installation Instructions - GE Profile PP989SNSS Owner's Manual & Installation Instructions

Radiant downdraft cooktop
Table of Contents

Advertisement

Available languages

Available languages

PARTS INCLUDED (PACKED BELOW THE COOKTOP)
• Blower assembly
• Blower plenum
• (4) Nuts (10-32 keps – nuts with
lock washers attached)
Check to be sure that all packing materials
and tape have been removed. This will include
tape on control knobs (if applicable), adhesive
tape, wire ties, cardboard and protective
plastic. Failure to remove these materials could
result in damage to the appliance once the
appliance has been turned on and surfaces
have heated.
Sheet Metal Screws
(9) (8-18 x 3/8 )
Cleaning Cream
CAUTION:
DO NOT BUMP EDGE OF GLASS DURING
INSTALLATION
Blower Assembly and (4) Mounting
Nuts (10-32 keps – nuts with lock

Installation Instructions

UNPACKING YOUR COOKTOP
• (9) Sheet metal screws
(8-18 x 3/8 )
• Foam gasket tape (9 ft. roll)
• Vent grille
Scrub Sponge
GLASS IS FRAGILE
washers attached)
Vent Grille
Foam Gasket Tape
Blower
Plenum
14
• Vent filter
• Cleaning cream
• Scrub sponge or scraper
(on some models)
CAUTION:
DO NOT LIFT
FROM VENT
OPENING OR
BUMP GLASS
Vent
Filter

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Profile PP989SNSS and is the answer not in the manual?

This manual is also suitable for:

Pp989

Table of Contents