Download Print this page

Advertisement

Quick Links

—— Installation & Safe Use Manual ——
Models: PR20, PR29, PR31, PR33,
and BA775 poles ordered separately
Tough Duty Gooseneck Basketball Systems
P A R T S L I S T
Item
Qty
Description
A
1
Gooseneck Pole
B
1
Backboard Mounting Bracket
C
3
Band Clamp
D
2
7/16" x 2" Carriage Bolt
E
2
3/8" x 1" Hex Bolt
F
2
3/8" Flat Washer
G
2
3/8" Lock Washer
H
3
5/16" x 2" Carriage Bolt
I
2
5/16" x 1" Carriage Bolt
J
5
5/16" Flange Nut
K
2
7/16" Flat Washer
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
Save this instruction in the event that the manufacturer must be contacted in the future
1. Call your local utility locating service, usually by dialing 811, before digging to avoid serious injury or
service interruption.
2. Select the location for the concrete base footing. Note that the face of the Backboard (Q) will be ap-
proximately 38" from the center of the footing. Dig a 12" diameter hole that is 36" deep. Remove
additional soil from the bottom 1/3-1/2 of the hole in a bell shape to add pole stability. In areas where
the normal frost line is below 36" it is advisable to dig to the normal frost line. See Figure 1.
3. Make sure that you have a level and a broomstick or similar pole to vibrate air pockets out of concrete.
A 12" diameter by 36" deep hole with a bell bottom will require approximately 3 cubic ft. or 3000 PSI
Quick Dry Concrete (T). You will need to adjust the amount depending on the size of hole you
prepared. Having too much is better than having too little.
4. Mix concrete according to the directions on the bag. It is advantageous to have the mixture "wet". This
will increase your working time and allow batches to mix in the hole. Pour the hole full to ground
level.
Date: 5/19/2021
Rev: 9
Item
L
M
N
O
P
Q
R
S
T
U
V
Read all instructions before proceeding.
B.A.
N.J.C.
Page 1
Qty
Description
2
7/16" Lock Washer
2
7/16" Hex Nut
2
Backboard Brace
2
1/2" Set Screw, Square Head
2
1/2" Jam Nut
1
Backboard (packaged separately)
1
Rim, Mounting Hardware, & Net (packaged separately)
1
1/4" x 1" Roll Pin
TBD
Quick Dry Concrete (supplied by customer)
1
Pole Pad (optional)
1
Removable Rim Bracket Kit (PR33 only, packaged separately)
File: Bisonserver/publisher/instructions/BA775
Customer Service
(800) 247-7668
Ref#:920099

Advertisement

loading

Summary of Contents for Bison PR20

  • Page 1 —— Installation & Safe Use Manual —— Models: PR20, PR29, PR31, PR33, and BA775 poles ordered separately Customer Service Tough Duty Gooseneck Basketball Systems (800) 247-7668 P A R T S L I S T Item Description Item Description Gooseneck Pole 7/16”...
  • Page 2 5. Attach one Band Clamp (C) with 5/16” x 2” Figure 1 Carriage Bolt (H), and 5/16” Flange Nut (I) approximately 12” from the bottom end of pole and insert pole into concrete while vibrating concrete to allow it to surround the pole completely.
  • Page 3 Figure 4 Figure 5 10. Referencing the illustrations below fasten Backboard Braces (N) to the Backboard (Q). Each model will require different hardware to attach the Backboard Braces (N) to the Backboard (Q). BA475SS requires 3/8” x 1” Hex Bolts (E), 3/8” Flat Washers (F), and 3/8” Lock Washers (G). BA454 requires 5/16” x 1” Carriage Bolts (I) and 5/16”...

This manual is also suitable for:

Pr29Pr31Pr33Ba775