FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
STEP 2 – INSTALL WATER HEADERS
The ACBC is designed with a recessed cavity on the rear of
the beam to accommodate water supply and return headers.
Install headers securely to the wall, as shown in Figure 2.
Ensure piping fits within recessed cavity. See previous pages
for dimensions.
The ACBC can be supplied with a right hand or left hand water
coil connection. These can be plumbed using sweat, NPT or
push on connections. The beams are to be piped in parallel to
maintain the scheduled inlet water temperature. The final water
connections are completed in Step 4.
STEP 3 – SECURE THE ACBC TO THE BLOCKING
With the face removed, the mounting brackets will be visible
on either side of the beam, as shown on right. Position the
ACBC in the desired location according to the approved plans.
Ensure the casing is flush against the wall. The mounting
brackets should then be securely fastened to the blocking.
STEP 4 – CONNECT THE WATER
SUPPLY AND RETURN LINES
Connect the supply and return piping to the beam water
coil. Hard pipe connections or flexible hose can be used. As
water lines are being connected, ensure geometry allows for
installation of any accessories on following pages.
STEP 5 – CONNECT THE CONDENSATE
LINE (IF APPLICABLE)
Connect the drain line to the buildings drain return;
connections can be made with either hard pipe or flexible
hose. Ensure a water tight connection is made.
STEP 6 – CONNECT THE AIR INLET COLLAR
Connect the supply air to the ACBC inlet collar. The air
connection can be made with either hard duct or flex duct.
Ensure an airtight connection to achieve desired performance.
As air inlets are being connected, ensure geometry allows for
installation of any accessories on following pages.
STEP 7 – CONNECTING ADDITIONAL
BEAMS (IF APPLICABLE)
It is acceptable to duct multiple beams in series. Use field
supplied duct interconnects to attach adjacent beams
together.
6
FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com
UNIT ALIGNMENT
MOUNTING
BRACKETS
ACBC 1 WAY
COLD WATER
RETURN
COLD WATER
SUPPLY
ACBC 2 WAY
HOT WATER
RETURN
HOT WATER
SUPPLY
COLD WATER
RETURN
COLD WATER
SUPPLY
MOUNTING
BRACKETS