FLOOR MOUNTED ACTIVE BEAM
INSTALLATION & MOUNTING INSTRUCTIONS
Step 5: Locate the top and bottom
mounting brackets. Pictured in Figure
24.
Step 6: Secure the utility cabinet against
the wall blocks with the screws provided
by others. Pictured in Figure 24.
Step 7: Install access door and
retighten the spring latches by turning
them both to the right until secure.
Pictured in Figure 25.
FIGURE 24
Figure 3 Part A
Figure 3 Part C
B
DETAIL C
FIGURE 25
www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual
Figure 3 Part B
MOUNTING BRACKETS
DETAIL B
MAKE SURE TAB IS
BEHIND FLANGE
ROTATE RIGHT
DETAIL E
SCREW IN
SCREW IN
C