Price ACBC Series Manual

Floor mounted active beam

Advertisement

Quick Links

MANUAL – INSTALLATION
Floor Mounted Active Beam
ACBC Series
v300 – Issue Date: 07/16/20
© 2020 Price Industries Limited. All rights reserved.

Advertisement

Table of Contents
loading

Summary of Contents for Price ACBC Series

  • Page 1 MANUAL – INSTALLATION Floor Mounted Active Beam ACBC Series v300 – Issue Date: 07/16/20 © 2020 Price Industries Limited. All rights reserved.
  • Page 2: Table Of Contents

    Airflow Calibration Chart for 7ft ACBC ......14 Installing an Active Bookshelf ........15 Installing an Inactive Bookshelf........20 Installing a Filler Section ..........24 Installing a Utility Cabinet ..........28 Having difficulty installing this product? Price is here to help. APPLICATION SUPPORT 204.669.4220 beamteam@priceindustries.com priceindustries.com...
  • Page 3: Installation Instructions

    (1 way or 2 way) match the requirements sensor(s) or humidity sensor(s) according to sensor manufacturer’s methods and schedule. specified for that particular beam by cross referencing the Price provided schedule, the order linestring and line instructions with the units that are on site.
  • Page 4 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS ACBC LEFT SIDE INLET RIGHT SIDE INLET LEFT & RIGHT SIDE DUAL INLET TOP LEFT CASING OPENING WITH LEFT SIDE INLET TOP RIGHT CASING OPENING TOP LEFT CASING OPENING WITH RIGHT SIDE INLET WITH LEFT &...
  • Page 5: Required Tools/Parts

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Required Tools/Parts To be supplied by contractor • Laser Level • Tape Measure • Mounting Screws • Cordless Drill/Impact • Clamps/Locking Plier • Damp cloth(s) (for cleaning) • Wood Blocks Submittal Sheet Dimensional Data ACTIVE CHILLED BEAM CABINET DIMENSIONAL DATA...
  • Page 6 270567 SUBMITTAL DATE: SPEC. SYMBOL: 2019/04/29 OVERALL LENGTH ACTIVE COIL LENGTH Submittal Sheet SHEET REV: 0 ACBC-1-1 © 60.000 Copyright PRICE INDUSTRIES 2018 36.000 23.500 67.750 (1500) 36.000 27.500 ACTIVE COIL LENGTH SECTION 72.000 48.000 23.500 87.438 (2000) 60.000 25.500...
  • Page 7: Installation

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Installation FIGURE 1: MOUNTING BRACKETS Handling Prior to Installation ACBC 1-WAY ACBC 2-WAY • Avoid introducing contaminants into the unit. • When handling the unit, we recommend wearing clean, white cotton gloves to avoid smudging. •...
  • Page 8 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS STEP 2 – INSTALL WATER HEADERS UNIT ALIGNMENT The ACBC is designed with a recessed cavity on the rear of the beam to accommodate water supply and return headers. Install headers securely to the wall, as shown in Figure 2. Ensure piping fits within recessed cavity.
  • Page 9: Water System Preparation

    (i.e. hot discharge slot, near the end of the beam. waterflow rate going through hot water coil.) • Adjust balancing damper to match the Price project schedule static pressure to the measured result. • Damper should be used for trimming only.
  • Page 10: Damper Installation

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Damper Installation MQ DAMPER Select the appropriate MQ/VAV Damper required for the location based on the diameter of the unit or zone duct. The MQ/VAV damper should always be installed in locations that are accessible for inspection and removal if necessary.
  • Page 11: Interpretation Of Beam Tag

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Interpretation of Beam Tag All beams come shipped with a tag on the unit and on the outer packaging. This tag should be checked to ensure that the beam is placed in the proper location, and contains the correct options. ACBC Linestring 0 75992500210001 8001 ORDER...
  • Page 12: Airflow Calibration Chart For 3Ft Acbc

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Airflow Calibration Chart for 3ft ACBC 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 NOTE: Data presented for Standard Atmosphere at sea level 0.10 Primary Air Flow at Sea Level (SCFM) FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com...
  • Page 13: Airflow Calibration Chart For 4Ft Acbc

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Airflow Calibration Chart for 4ft ACBC 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 NOTE: Data presented for Standard Atmosphere at sea level 0.10 Primary Air Flow at Sea Level (SCFM) www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual...
  • Page 14: Airflow Calibration Chart For 5Ft Acbc

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Airflow Calibration Chart for 5ft ACBC 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 NOTE: Data presented for Standard Atmosphere at sea level 0.10 Primary Air Flow at Sea Level (SCFM) FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com...
  • Page 15: Airflow Calibration Chart For 6Ft Acbc

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Airflow Calibration Chart for 6ft ACBC 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 NOTE: Data presented for Standard Atmosphere at sea level 0.10 Primary Air Flow at Sea Level (SCFM) www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual...
  • Page 16: Airflow Calibration Chart For 7Ft Acbc

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Airflow Calibration Chart for 7ft ACBC 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 NOTE: Data presented for Standard Atmosphere at sea level 0.10 Primary Air Flow at Sea Level (SCFM) FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com...
  • Page 17: Installing An Active Bookshelf

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Installing an Active Bookshelf BOOKSHELF PARTS Bookshelf (Active) Parts List Quantity of parts per beam: A. (1) Bookshelf B. (1) Back Panel C. (1) Access Door D. (6) Screws E. (1) 4mm Allen Key A.
  • Page 18 WALL MOUNTING 30.000 BRACKETS 3.545 INACTIVE BOOKSHELF SHOWN PROJECT: ACBCBK ENGINEER: ACTIVE CHILLED BEAM CUSTOMER: 270571 CABINET BOOKSHELF SUBMITTAL DATE: SPEC. SYMBOL: 2019/04/29 SHEET REV: 0 © ACBCBK-1-1 Copyright PRICE INDUSTRIES 2018 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com...
  • Page 19 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Bookshelf (Active) Installation for FIGURE 3 ACBC Step 1: Determine bookshelf locations and orientation according to approved plans. Step 2: Secure blocking that runs Figure 1 across the wall at the height of the bookshelf mounting brackets.
  • Page 20 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Step 5: Locate the bottom mounting FIGURE 5 brackets and secure bookshelf with two screws, reference Figure 5. Step 6: Remove the two screws from the back panel, pictured in Figure 6. Do not discard screws.
  • Page 21 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Step 8: Locate top mounting bracket FIGURE 7 holes on bookshelf and secure to wood blocking with screws by others, pictured FRONT OF UNIT in Figure 7. Step 9: With the top of the back panel SCREW IN SCREW IN rotated towards you, place the back...
  • Page 22: Installing An Inactive Bookshelf

    INACTIVE BOOKSHELF SHOWN Casing Length PROJECT: 24.000 30.000 ACBCBK 36.000 ENGINEER: ACTIVE CHILLED BEAM CUSTOMER: 270571 CABINET BOOKSHELF SUBMITTAL DATE: SPEC. SYMBOL: 2019/04/29 FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com SHEET REV: 0 © ACBCBK-1-1 Copyright PRICE INDUSTRIES 2018...
  • Page 23 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Bookshelf (Inactive) Installation for FIGURE 10 ACBC Figure 1 Step 1: Determine bookshelf locations and orientation according to approved plans. Step 2: Secure blocking that runs across the wall at the height of the bookshelf mounting brackets.
  • Page 24 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Step 5: Remove the two screws from FIGURE 12 the back panel then secure it to the bookshelf, pictured in Figure 12. Do not FRONT OF UNIT discard screws. Step 6: Place hands in both slots in the back panel and lift straight up 1.5 PLACE HAND HERE...
  • Page 25 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Step 10: Align the holes of the back FIGURE 15 panel with the holes on the bookshelf and secure in place with the two screws from step 5. Reference Figure 15. Step 11: Install the middle shelf. Align the holes of the middle shelf with the holes of the side panel and secure in SCREW...
  • Page 26: Installing A Filler Section

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Installing a Filler Section FILLER SECTION PARTS List Quantity of parts per beam: A. (1) Filler Section B. (4) Side Mounting Bracket C. (1) Top Mounting Bracket D. (1) Bottom Mounting Bracket E.
  • Page 27 MIN = 6.000" MAX = 36.000" SUBMITTAL DATE: ONSTRUCTION: 13.500 1/8" INCREMENT CONSTRUCTION (STEEL) NOTES: • FACTORY TOLERANCE +/- 1/32 © Copyright PRICE INDUSTRIES 2018 OLERANCE +/- 1/32 FINISH:  B12 - WHITE POWDER PAINT WALL MOUNTING  SPL - SPECIAL COLOR PAINT BRACKETS...
  • Page 28 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Filler Section Installation for ACBC FIGURE 17 Step 1: Determine Filler section locations and orientation according to 1.125” GAP IN BETWEEN TOP MOUNTING BRACKET approved plans. 13.500 AND WOOD BLOCKING Step 2: Secure blocking that runs WOOD across the wall at the height of the filler BLOCKING...
  • Page 29 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Step 6 (If Applicable): If installing the FIGURE 20 filler section next to a connecting unit 12.875 and wall, follow Step 5 for installing to connecting unit. Repeat once. When 11.625 installing to the wall, locate the side mounting brackets as shown in Figure 20 and secure in place with screws, by installing mounting brackets to wall at...
  • Page 30: Installing A Utility Cabinet

    FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Installing a Utility Cabinet UTLITY CABINET PARTS List Quantity of parts per beam: A. (1) Utility Cabinet B. (1) Access Door C. (1) 4mm Allen Key A. (1) UTILITY CABINET B. (1) ACCESS DOOR C.
  • Page 31 TOLERANCE +/- 1/32 2019/04/29 INLET LOCATION (SEE PAGE 2): SHEET REV: 0 ACBCUC-1-1 TION (SEE PAGE 2): © Copyright PRICE INDUSTRIES 2018  L - LEFT  R - RIGHT WALL MOUNTING  WALL MOUNTING LR - LEFT & RIGHT &...
  • Page 32 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Utility Cabinet Installation for ACBC FIGURE 22 Step 1: Determine utility cabinet locations and orientation according to approved plans. Figure 1 WALL Step 2: Secure blocking that runs across the wall at the height of the utility cabinet mounting brackets.
  • Page 33 FLOOR MOUNTED ACTIVE BEAM INSTALLATION & MOUNTING INSTRUCTIONS Step 5: Locate the top and bottom FIGURE 24 mounting brackets. Pictured in Figure Figure 3 Part B Figure 3 Part A Step 6: Secure the utility cabinet against the wall blocks with the screws provided by others.
  • Page 34 FLOOR MOUNTED ACTIVE BEAM NOTES FLOOR MOUNTED ACTIVE BEAM - Manual | www.priceindustries.com...
  • Page 35 FLOOR MOUNTED ACTIVE BEAM NOTES www.priceindustries.com | FLOOR MOUNTED ACTIVE BEAM - Manual...
  • Page 36 This document contains the most current product information as of this printing. For the most up-to-date product information, please go to www.priceindustries.com. © 2020 Price Industries Limited. All rights reserved.

Table of Contents