Sma Operation - SMA Sunny Island SIC50-MPT Installation Manual

Charge controller
Table of Contents

Advertisement

SMA Solar Technology AG
6.6.3 SMA Operation
The communication between the charge controller and the Sunny Island 5048/2012/2224 allows
the charge controller to be controlled in a coordinated manner. This ensures precise calculation of the
state of charge in the Sunny Island without an additional battery current measuring shunt.
All important operating data of the charge controller can be read on the Sunny Island display. In
addition, the most important values are saved on the Sunny Island SD card.
Up to four charge controllers can be connected in parallel to one Sunny Island system.
SIC50-MPT 1
More information on installing and connecting the SIC-PB communication interface can be found in
the SIC-PB installation guide.
Pin Assignment of the Micro Ribbon Cable
Pin
Function
8
GND
10
GND
11
RXD
12
TXD
Installation Guide
SIC50-MPT 2
SIC50-MPT 3
Level
0 V
0 V
TTL
TTL
SIC50-MPT 4
Sunny Island
Description
reference potential
reference potential
charge controller input
charge controller output
SIC50-IA-en-11
Electrical Connection
27

Advertisement

Table of Contents
loading

Table of Contents