Download Print this page

H3 Falcon 4010 Quick Installation Manual page 15

Hide thumbs Also See for Falcon 4010:

Advertisement

4. Connect to A/C power
Falcon 4010 will be powered-on when the power cords are plugged in. No further action is required
for this step.
Please make sure that each drawer is powered by at least 1 PSU.
5. Check LCD for system readiness
When the system is ready, the LCD will display the model name and the IP address.
E.g. "Falcon 4010"
10.0.24.52
You can now proceed to GUI set up
12

Advertisement

loading