18. When installed, install the radar (2). Connect the radar
electrical connector (1).
19. Install the side shield on both sides of the engine.
20. Connect the battery ground lead.
21. Fill the engine cooling system. For further informa-
tion, refer to Engine cooling system - Change fluid
(10.400).
Next operation:
Front ballast - Install (39.140)
Engine - Engine and crankcase
47770440A 15/02/2017
10.1 [10.001] / 11
15
BAIS06CCM080AVB