Download Print this page

Hitachi ZW 550-G Technical Manual page 48

Wheel loader

Advertisement

12-6
Function & Structure Chassis Group
Rear Chassis
Floor board mount
Floor board
1
1. Floor board
2. Viscous mount
The floor board is installed on the rear chassis by the
rubber cushion. The instrument panel, control box,
operator's seat and the air conditioner unit are on the
floor board.
Note
The access hole for floor servicing is provided on S/N
9004~ (Europe) and S/N 0108~ (other area).
2
115ZV12008
Inspection hole
(S/N 0108~,
9004~)
K115ZVE12002
Viscous mount
1
2
3
4
5
6
7
8
1. Stud
2. Cushion rubber
3. Case
4. Cap
5. Damping plate
6. Plain washer
7. Head bolt
8. Silicon oil
9. Plug
The floor board is supported by a viscous mount in four
positions so that vibrations, impacts and sounds gener-
ated in the chassis are not transmitted to the inside of
cabin.
9
70ZV12007

Advertisement

loading