Econar GeoSource 2000 GV Series Installation And Operating Instructions Manual page 7

Vertical and horizontal forced air
Table of Contents

Advertisement

Table
3
-
Side
Flow
Rates
Pressure/Temperature
(P/T)
ports should
be
installed
in
the
entering
and
leaving water lines
of
the heat
pump on
a
closed
loop
system
(see
Figure
1). A
thermometer
can be
inserted
into
the
P/T
ports to
check
entering
and
leaving
water temperatures.
A
pressure gauge can also be
inserted
into
these
P/T ports to determine
the pressure
differential
between
the
entering
and
leaving
water. This
pressure
differential
can then be
compared to
the
specification
data on each
particular
heat
pump to
determine
the
flow
rate
of
the system.
A
PumpPAKrM that is
individually
sized
for
each
application
can
supply pumping requirements
for
the
earth loop
fluid.
The PumpPAKrM
can also be used
to
purge
the
loop system.
The PumpPAKrM is wired
directly
to
the
contactor
and operates
whenever
the
compressor
runs
(see
Electrical
Diagram
-
Figure
5).
If
a
PumpPAKrM
is
not
used,
a
separate
pump
can be used
which
is energized
with
a
pump relay (note: electrical
code
will
require
a
fused
disconnect
for
pumps other than
PumpPAKsrM).
Filling
and
purging
a
closed
loop
system are
very
important
steps
to
assure
proper
heat
pump operation.
Each loop
must be
purged
with
enough
water
flow
to
assure
a
two
feet per
second
flow
rate
in
each
circuit in
the
loop.
This
normally
requires a
lYz
to
3
HP high
head
pump to circulate
fluid
through
the
loop to remove
all
the
air out
of
the
loop
and
into
a
purging
tank. Allow
the
pump
to
run
10
to
l5
minutes after
the
last air bubbles
have been
removed.
Enough
antifreeze
must
be added
to
give a
l0"F
to
l5oF
freeze
protection to
the
earth loop
system.
This
amount should
be
calculated
and added
to
the
loop after purging is
complete.
After
antifreeze
has
been
installed
it
should
be measured
with
a
hydrometer,
refractometer
or
any
other device to determine
the
actual
freezing
point of
the
solution. Remember that
a
low
antifreeze level
will
lock
the heat
pump out
on
low
pressure
during wintertime
operation.
The
purge
pump
can be used
to
pressurize the system
to
an
initial
static
pressure
of
30-40
psi.
Make
sure the
system
is
at
this
pressure
after
the
loop pipe
has
had
enough
time
to stretch. In
order to
achieve the 30
to 40
psi
initial
pressure, the
loop may
need
to
be
pressurized to
60 to
65
psi.
This
static
pressure
will
fluctuate
from
heating to
cooling
season,
but
the pressure
should always
remain
above
zero
so
circulation
pumps
do
not cavitate
and
air
cannot be
pulled into
the system.
SFor
information
regarding
earth
loop
installations contact
your
local
installer,
distributor
or factory
representative.
B.
Open Loop
Applications
An
open
system gets
its
name
from
the open
discharge
of
water after
it
has
been used
by
the heat
pump. A
well
must
be
available that can supply
all of
the
water
requirements
(see
Table 3)
of
the heat
pump along
with
any
other water requirements drawing
off
that
same
well.
The
well
must be capable
of
supplying
the heat
pump's
required
flow
rate
for
up
to
24
hours
per
day on
the
coldest
winter
day.
Fi_gure
2 shows the necessary
components
for
water
piping of
an
open
system. First,
a
bladder type
pressure
tank
with
a
"draw
down" of
at
least
lVz
times
the
well
pump capacity must
be
installed
on the
supply
side
of
the
heat
pump.
Shut
off
valves
and
boiler
drains
on the
entering
and
leaving water lines
are necessary
for future
maintenance issues.
A
screen
strainer
is
placed on
the
supply
line with
a
mesh size
of
40 or 60
and enough
surface area
to
allow for
particle
buildup
between
cleanings.
Pressure/Temperature
(P/T)
ports
are
placed
in
the
supply
and
discharge lines
so
that thermometers or
pressure
gauges can be
inserted
into
the water
stream.
On the
well
water discharge
side
of
the heat
pump,
a
flow
control
valve
must be
mounted next to
the heat
pump to regulate
the
maximum
water
flow
through the
unit. A
solenoid
valve is
then
installed
and
wired
to
the accessory
plug on
the
controller.
This
valve
will
open when
the
unit
is
running
and
close when
the
unit stops.
A
visual
flow
meter is
then
installed to
allow
visual inspection
of
the
flow
requirements.
The
flow
meter is useful
in
determining when maintenance
is
required.
(If
you can't
read the
flow,
cleaning is required.)
Schedule
40 PVC
piping,
copper tubing, polyethylene
or
rubber
hose can be used
for
supply
and
discharge water
lines.
Make
sure
line
sizes are
large
enough
to supply
the
required
flow
with
a
reasonable pressure
drop (generally
l"
diameter
minimum).
NOTE:
Do not
use
plastic
female
fittings with
metal
male
fittings,
or fractures may
result
in
the
female
fittings.
Always
use
plastic male
into
steel female
!
Water
discharge
is
_eenerally
made
to
a
drain
field,
stream,
pond,
surface
discharge,
tile
line,
or
storm
sewer.
VCAUTION:
Using
a
drain
field
requires soil
conditions
and adequate
sizing to
assure
rapid percolation,
or
the
required
flow
rates
will
not
be
achieved.
Consult
local
codes and
ordinances to
assure
compliance.
DO
pf
discharge water to
a
septic
system.
5
G(V,H)18
4
0.9
2
0.9
Gff.H)23
6
3.0
3
0.9
Gry.829
7
3.9
4
1.5
G(V,H)36
8
5.5
4
1.3
Gry,H)42
l0
7.8
5
1.7
G(v.H)s2
t1
5.2
6
1.6
G(V,H)s9
l3
6.0
9
3.1
G(V,H)67
11
1.0
10
3.8
22
3.8
12
2.s
G(v.H)120
26
4.5
t6
3.0
Closed
Las::
O*n
Looo
Mt{el
Flow
{pom)
a"
{ori}
II,orr
{qom}
dP
(osi)
Gry.m98
L
L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents