Econar GeoSource 2000 GV Series Installation And Operating Instructions Manual page 18

Vertical and horizontal forced air
Table of Contents

Advertisement

XIV. ADDITIONAL
FIGURES AND TABLES
Hanger
Assembly
--'-V
Note:
Conceptual drawing only.
Please
fol1ow directions
included with
hanger
assembly
kit for proper inst-a1laf-ion.
Figure
4
-
Horizontal
Unit
Hanging
Bracket
Table
6
-
Controller
#20-1038
LED
Indicator Chart
Blown
fuse or
power
removed.
AC power applied
x
x
ASC indicator on for 4' 35"
on power
initialization.
X
Power applied
-
unit running
or
waiting for
a
call
to
run.
Run
cycle
complete
x
X
ASC indicator ON
for
30
to
60 seconds after compressor shutdown.
Indicates
LP switch position (ON
= open).
LP (F/A heating
- before
call)
X
x
x
x
x
Lockout, indicators
latched and resettable by
removing
power.
LP
(F/A
cooling -
before
call)
x
x
Indicates
LP switch position (ON
= open).
LP
delayed 90 seconds on
initial
call,
then
ASC
and
LP
indicator ON while switch
is open.
LP (F/A cooling -
after
call)
x
x
X
x
x
flash
LP indicator
will
flash
if
switch
ciosed
during ASC period.
Indicator
reset
a-fter
ASC period.
HP (F/A
heating - before
call)
x
x
lndicates HP switch position (ON =
open).
HP (F/A heating -
after
call)
x
x
x
Lockout, indicators
latched and resettable by
removing
power.
t{P
(F/A cooling
- belore
call)
x
x
Indicates
HP switch position (ON =
open).
Lockout, indicators
latched
and
resettable by
removing
power.
IIP
(F/A cooling -
after
call)
x
X
x
Indicates FP
switch position (ON =
open).
x
x
FP
(F/A
heating
-
after
call)
x
X
x
Lockout, indicators
latched and resettable
by removing
power,
FP
switch
disabled
in
cooling
mode.
x
Condensate Overfl
ow Detector
(F/A heating)
x
x
krdicator ON while
water present on sensor
(optional).
x
x
lndicator ON while
water present on sensor
(optional).
Condensate
Overllow
Delector
(F/A cooling
- after
call)
x
x
x
lndicator ON while
water present on sensor,
ASC period
with
call for
F/A
cooling only (optional).
I
I
16
LSND]?IOI{
COM}{[NTS
.{sc
IF
m
r?
orD
LP
(F7A
heating
- after
call)
FP
(F/A heating
- before
call)
FP
(F/A
cooling)
Condensate
Overflow Detector
(F/A
cooling
-
before
call)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents