START-UP CHECK LIST
Start-up date:
Equipment sold by:
Installed by:
Site address:
Equipment type and serial numbers:
Electrical data:
Supply voltage:
Nominal voltage:
Current draw:
Control circuit voltage
Main circuit breaker rating:
Physical data:
Condenser:
Entering air temperature:
Leaving air temperature:
Pressure drop (air):
Discharge air pressure:
Fan speed:
Fan motor input:
Safety device setting:
High pressure switch:
Low-pressure switch:
Control thermostat:
Oil level:
Oil visible in sight glass:
Colour of moisture indicator:
Air bubbles visible in sight glass:
Accessories:
-
-
Commissioning engineer (name):
Name
Remarks:
NOTE: Please fill in this sheet during the installation
Ph.
V
Ph. 1
r/s or rpm
Ph. 1
Ph. 1
Ph. 1
Ph. 1
cut-out
cut-out
cut-out first step
cut-out second step
Contract No.:
Contract No.:
V
Ph. 2
% network voltage:
A
Ph. 2
V
Circuit breaker calibration
Compressor:
°C
Circuit 1: Suction gas temperature:
°C
Suction gas pressure:
kPa
Circuit 2: Suction gas temperature:
Pa
Suction gas pressure:
V
Ph. 2
V
Ph. 2
V
Ph. 2
V
Ph. 2
kPa:
cut-in
kPa
cut-in
°C
cut-in first step
°C
cut-in second step
Date
V
Ph. 3
A
Ph. 3
V
Ph. 3
V
Ph. 3
V
Ph. 3
V
Ph. 3
V
A
A
A
°C
kPa
°C
kPa
V
V
V
V
kPa
kPa
°C
°C
3