Download Print this page

Rosehill Wine Cellars 6ft Premier Cru Kit Rack Assembly Instructions

375ml half bottles single column

Advertisement

Quick Links

Assembly Instructions -6Ft-
Tools Needed:
• Hammer
(Preferred)
• Pneumatic Brad Nailer
• Power drill
• Level
• Power miter saw (Preferred)
3
pilot drill
32
• Nail Set
• Wood filler (Optional)
• 180 grit sand paper (Optional)
Tips:
1. Using pneumatic brad nailer will make assembly
quicker and easier.
2. Before opening any boxes, if multiple units and
different units have been ordered, please assemble
all boxes by units to ensure that specific unit parts
are not intermixed with other units.
3. It is highly recommended to drill
holes on back cross pieces for
before attaching to wall.
6ft Premier Cru
Kit Rack
Fasteners
1
1
finishing nails to
4
fasten cross pieces
1
1
brad nails if using
4
pneumatic brad nailer
1
#8x1
screws to attach
4
to other modules
#8x3
screws for attaching
racks to wall
3
dia pilot
32
#8x3
screws
Apr/23/2012
Toll Free: 1-888-253-6807
375ml Half Bottles Single Col.
www.RosehillWineCellars.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the 6ft Premier Cru Kit Rack and is the answer not in the manual?

Questions and answers

Summary of Contents for Rosehill Wine Cellars 6ft Premier Cru Kit Rack

  • Page 1 Assembly Instructions -6Ft- Fasteners Tools Needed: • finishing nails to • Hammer (Preferred) • Pneumatic Brad Nailer fasten cross pieces • Power drill • brad nails if using • Level pneumatic brad nailer • Power miter saw (Preferred) #8x1 • screws to attach pilot drill •...
  • Page 2 Crown (1pc)Right end ladder (1pc) Left end ladder (9 pcs) Cross piece Baseboard 6ft Premier Cru Toll Free: 1-888-253-6807 Apr/23/2012 375ml Half Bottles Single Col. Kit Rack www.RosehillWineCellars.com...
  • Page 3 Step 1 Step 2 Attaching cross pieces to the BACK Attaching FRONT ladders. Place the right and left end ladders on the floor making sure the Nail the cross pieces under the 6th, 11th and 14th cleat angled cleats are facing floor. Nail the cross pieces under the starting from the bottom.
  • Page 4 Step 3 Attaching to the wall Fasten to the wall through the back cross pieces using #8x3 “ screws and using a level to make sure rack is mounted square on the wall. Make sure back cross piece has ” dia pilot holes drilled before screwing to wall. For a professional looking job you can use a nail set to indent the nail heads and wood filler to fill in the nail holes on the front cleats, baseboard and crown moulding.

This manual is also suitable for:

Cru6 375ml1colCru6 mag1col