Summary of Contents for Rosehill Wine Cellars Premier Cru Waterfall Right CRU6 WATERRIGHT
Page 1
Assembly Instructions -6Ft- Fasteners Tools Needed: • finishing nails to • Hammer • Pneumatic Brad Nailer (Preferred) fasten cross pieces • Power drill brad nails if using • • Level pneumatic brad nailer • Power miter saw (Preferred) #8x1 screws to attach •...
Page 2
(2pcs)Middle ladder Crown (1pc) Left end ladder (1pc)Middle ladder (1pc)Middle ladder (1pc)Middle ladder ((1pc)Middle ladder (10 pcs) Cross piece (1pc)Middle ladder (1pc)Right end ladder (2 pcs) Cross piece (7pcs) Cross piece Baseboard 6ft Premier Cru Toll Free: 1-888-253-6807 Apr/23/2012 750ml Waterfall Right Kit Rack www.RosehillWineCellars.com...
Page 3
Step 1 Step 2 Attaching cross pieces to the BACK Attaching middle ladders. Place the right and left end ladders on the floor making sure the Take the middle ladders making sure the angled cleats are facing front. Place each ladder into cross piece slots and nail from the angled cleats are facing floor.
Page 4
Step 3 Step 4 Attaching FRONT ladders. Attaching to the wall Nail the cross pieces under the 5th, 9th and 10th cleat starting Fasten to the wall through the back cross pieces using #8x3 “ screws and from the bottom. Nail first top cross piece that is facing using a level to make sure rack is mounted square on the wall.
Need help?
Do you have a question about the Premier Cru Waterfall Right CRU6 WATERRIGHT and is the answer not in the manual?
Questions and answers