6150-ID Sharpshooter PIR
Installation Instructions

Installation

1.
Run the PinPoint system wiring to the unit location.
2.
Open the unit by snapping the front cover down and
off the base (Figure 1).
CAUTION
You must be free of all static electricity
before handling sensor circuit boards.
Touch a grounded, bare metal surface
before touching ciruit boards or wear a
grounding strap.
3.
Use the masking kit (Figure 5) if you need to adjust
zone coverage for your application. See Masking.
Figure 5.
Masking
L
K
J
H
G
F
E
D
W
V
U
T
S
R
Q
P
4.
Set the pulse and sensitivity DIP switches (Figure
6). See DIP switches.
Figure 6.
DIP switches
PinPoint address
DIP switches
1 2
3 4 5 6 7 8
on
5.
Set the PinPoint address DIP switches (Figure 6).
Devices are shipped with DIP switches set to 255.
This is an invalid address. The device will not
communicate with the controller and the walk test
LED will not light until a valid address has been set.
Refer to the controller's manual to determine the
correct address setting for each unit.
6.
Pull the PinPoint wiring through the base and attach
the base to the wall using the corner or flat wall
knockouts (Figure 7). For optimal coverage using
the standard lens, mount 6 feet 10 inches (2.1 m)
above the floor.
See Swivel bracket mounting for instructions on
mounting with the swivel bracket (Figures 9 and 10).
C
B
A
C
STANDARD LENS
O
N
M
PEEL AND STICK TO GROVE SIDE OF LENS
Pulse (1) and
sensitivity (2)
DIP switches
Figure 7.
Mounting without the swivel bracket
Wiring
knockout
Corner
mounting
knockout
Flat wall
7.
Strip 1/4 inch (6.4 mm) of insulation from each
PinPoint wire. Connect the wiring to the appropriate
screw terminals (Figure 8) and tighten the screws.
Make sure the cable is slack in the wall to avoid
stressing the wires at their connections.
Figure 8.
PinPoint wiring
1 2
on
8.
Snap the cover back on the base and seal all
openings.
9.
Walk test the unit to confirm correct operation (see
Walk test).
10. Slide the LED cover up to hide the LED (Figure 1), if
desired.
15
10
5
Corner
0
5
10
mounting
knockout
10 5
10
0 5
Flat wall mounting
knockouts
Corner
- + - +