Table of Contents

Advertisement

4 Installation

4 Installation
Any equipment connected to WAVE Cabinet must fulfill applicable standards and local
regulations.
Site requirements
Parameter
Electrical power
Ambient temperature
Placement
Relative humidity tolerance
Transport
The WAVE Cabinet can be transported shorter distances on its own wheels.
Unpacking
Unpack the WAVE Cabinet and place it at a stable leveled location indoors. Ensure that
the wheels are locked.
Check the equipment for damage before starting assembly and installation. Document
any damage and contact your local GE Healthcare representative.
12
Requirement
220 to 240 V, 50 to 60 Hz, 10 A
+4ºC to +30ºC
Stable leveled floor
20% to 95%, non-condensing
WAVE Cabinet 20/50 User Manual 28-9651-86 AA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wave cabinet 50

Table of Contents