Carrier XCT 7 40VU005~018C-7S-QEE Installation And Owner's Manual page 20

Compact 4-way cassette
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Installation Procedures
Tubing permissible length and height difference
Please refer to the attached manual for outdoor units.
Tubing materials and specifications
Please refer to the attached manual for outdoor units.
Model
Gas pipe
Tubing Size (mm)
Liquid pipe
Tubing Material
Phosphor deoxy bronze seamless pipe (TP2) for air conditioner
Refrigerant filling quantity
Add the refrigerant according to the installation instruction for outdoor units. Compressor failure can be caused by filling
too much or too little refrigerant. Refer to the outdoor unit manual for additional evacuation and pressure test procedures
prior to system operation.
Connecting procedures of refrigerant tubing
Proceed with the flare tube connecting operation to connect all the refrigerant tubes.
• Dual wrenches must be used for connecting the indoor unit tubing.
For mounting torque, refer to the table on the right.
wrench
Cutting and enlarging
Cutting or enlarging pipes should be carried out by
installation personnel according to the operating
criterion, if the tube is too long or the flare opening is
broken.
40VU005C-009C -7S-QEE
Ø9.52
Ø6.35
Outer Diameter of
Tubing (mm)
Ø6.35
Ø9.52
Ø12.7
40VU012C-018C -7S-QEE
Ø12.7
Ø6.35
Mounting Torque
(N-m)
11.8(1.2kgf-m)
24.5(2.5kgf-m)
49.0(5.0kgf-m)
Connecting
1. Connecting circular terminals:
The connecting method of the circular terminal is
shown in the Fig. Remove the screw, connect it to
the terminal tier after inserting it
through the ring
at the end of the lead and then
tighten it.
2. Connecting straight terminals:
The connection method for circular terminals is shown
in the Fig. Loosen the screw before inserting the line
terminal into the terminal tier, tighten the screw and
confirm that it has been clamped by pulling the line gently.
3. Pressing connecting line:
After line connection is completed, press the
connecting line with clips that should be pressed on the
protective sleeve of the connecting line.
terminal tier
correct
pressing
20
40VU024R-054R -7E-QEE
Ø15.88
Ø9.52
Increase Mounting
Torque (N-m)
13.7(1.4kgf-m)
29.4(3.0kgf-m)
53.9(5.5kgf-m)
Connecting
circular
terminals:
wrong
pressing

Advertisement

Table of Contents
loading

Table of Contents