Carrier XCT 7 40VU005~018C-7S-QEE Installation And Owner's Manual page 19

Compact 4-way cassette
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Installation Procedures
Lifting drainpipe
The drainpipe can be lifted 360 mm.
After the drainage pipe has been lifted, it must
be installed with a downward slope.
Confirming drainage
The drainage should be checked during the test run to ensure that there is no
leakage in the connection.
Fill water from the outlet or the specified position and check the drainage.
Fill 600 cc water using a hose from the outlet or the specified location on the
machine. Add the water slowly. Don't add water to the motor of the drainage pump.
• After mounting the electrical system, ensure that cooling occurs adequately and
also introduce water into the system for checking.
• If the electrical installation hasn't been completed, pull out the terminal (2P) of the
floater switch on the electrical cabinet. After confirming the drainage, connect the
terminal of the floater switch, and run the drainage pump for 5 minutes until it
stops automatically.
• Confirm the sound of the motor:
Confirm the sound of the motor of the drainage pump, and meanwhile check the
drainage.
hose
attached heat
insulating material
19
hose clamp
heat insulating
material
PVC pipe
100mm
below
under the ceiling
joint of drainpipe

Advertisement

Table of Contents
loading

Table of Contents