Lincoln Electric LN-25 Service Manual page 52

Portable cv/cc semiautomatic wire feeder
Hide thumbs Also See for LN-25:
Table of Contents

Advertisement

F-14
GAS SOLENOID VALVE AND CONTROL PC BOARD TEST
TEST PROCEDURE
GAS SOLENOID VALVE
1. Open the case door. Remove the wire reel by
removing the retaining collar. See Figure F.5.
2. Remove the screws holding the control box
cover in place and remove the control box
cover. See Figure F.5
All manuals and user guides at all-guides.com
TROUBLESHOOTING AND REPAIR
(FOR CODES ABOVE 10500 ONLY)
FIGURE F.5 – CONTROL BOX COVER REMOVAL.
(continued)
31
21
19
17
15
line
s
2
at
3
to
4
37 5
5
SCREWS
SCREW
WIRE REEL
LN-25™
F-14
CONTROL BOX
COVER
SCREW
RETAINING
COLLAR

Advertisement

Table of Contents
loading

Table of Contents