Rack Mounting The Ied; Rack Mounting A Single Ied - ABB Relion 650 Series Installation Manual

Intelligent electronic device
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 514 013-UEN -
4.3.3
4.3.3.1
650 series
Installation Manual
GUID-1D052708-4BED-48BA-BC2F-CD652AF6AA8D V1 EN
Figure 5:
Semi-flush mounted IED
A 154 mm + 12 mm with ring-lug connector
B 265 mm
C 95 mm
D 315.9 mm
E 13 mm

Rack mounting the IED

Rack mounting a single IED

1.
Remove the four plastic plugs from the right-hand side of the IED and attach
the right mounting panel securely using the required screws.
2.
Tighten the screws.
Section 4
Mounting
17

Advertisement

Table of Contents
loading

Table of Contents