Semi-Flush Mounting The Ied - ABB Relion 650 Series Installation Manual

Intelligent electronic device
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 514 013-UEN -
4.3.2
650 series
Installation Manual
GUID-F360FEBB-FE45-4305-81C8-3E7A7CF117B1 V1 EN
Figure 3:
Flush mounted IED
A 222 mm + 12 mm with ring-lug connector
B 27 mm
C 13 mm

Semi-flush mounting the IED

1.
Make a panel cut-out and drill screw holes according to the dimensional
drawing.
2.
Remove the plastic plugs from the side of the IED and locate it securely in the
rising frame using the required screws.
3.
Tighten the screws.
4.
Mount the IED with the rising frame to the panel cut-out.
Section 4
Mounting
15