Page 2
MOUNTING OPTION 1 Footing Detail for Installations Placed on Ground Level Support Post Hammer Footer Support Post SURFACING (3) Ground Spikes GROUND Instructions: 1. With Footers in position, secure each footer to the ground using (3) ground spikes. Footer NOTE: A 4 lb. hammer may be required to drive spikes into the ground.
Page 3
MOUNTING OPTION 2 Footing Detail for Installations Requiring Concrete Footers Support Post Footer Support Post SURFACING Footer (3) M10 x20mm ( 3/4”) BHCS Bolts GROUND Footer Instructions: In-ground 1. Bolt Footer and Inground Footer Footer together using (3)M10 x 20mm(3/4”) BHCS Bolts, and M10 Lock Nuts.
Page 4
1. Lower U-shaped Support Post(B) behind Parts List flange of Crawl Tunnel(A). Letter Description Quantity Part Number Crawl Tunnel 02-07-0057 2. Insert Bolt(D) through center hole in Support Post 02-07-0087 Crawl Tunnel(A), into Support Post(B) and Footer secure with Barrel Nut(E).
Page 5
SECURE CRAWL TUNNEL TO GROUND ABOVE GROUND INSTALLATION Parts List Letter Description Quantity Part Number For Above Ground installation using Ground Spikes 02-07-0048 Ground Spikes(A), refer to Mounting In-Ground Footer 02-07-0049 Option 1 on page 2. Hardware Complete 33-12-0058 33-11-0002 M10 x 20 BHCS Bolt M10 Lock Nut 33-11-0400...
Need help?
Do you have a question about the 02-07-0057 and is the answer not in the manual?
Questions and answers