Summary of Contents for Terra Bound Solutions Bedrock
Page 1
High Speed 3/8” electric drill w/ clutch Installation Time: 15 minutes – 30 minutes Concrete Required: 1.1781 cu ft. per post Note: Concrete must have a minimum rating of 2,500 psi and must be mixed per manufacturers recommendation. DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 1...
Page 2
5/16” x 5” RSS 1/4” x 2-1/2” #10 x 2-1/2” 5/16” x 4” RSS 5/16” x 3-1/8” 5/16” x 2-1/2” Stainless RSS Stainless R4 Stainless Stainless RSS Stainless RSS Stainless NOT TO SCALE! DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 2...
Page 4
HARDWARE IS TO BE FA STENED REQUIRES PRE- DRILLING TO ENSURE PRO PER INSTALLATION AND STRUCTURAL INTEGRITY. WE ARE NOT RESPONSIBLE FOR INSTALLATION OR ST RUCTURAL ISSUES THAT ARISE FROM NOT PRE-D RILLING ATTACHMENTS. DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 4...
Page 5
Bedrock Climber Installation Guideline Bedrock Climber Footer This space intentionally left blank. DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 5...
Page 7
Installation Guideline Bedrock Climber Assembly Ensure that the top of the bedrock (A) is flush with the top of the deck platform or Filler Block (B), pre drill through the pilot holes located in the Bedrock Climber support with a 3/16”...
Page 8
Once Bedrock Climber is attached swing the 2x3 Ensure that the 2x3 legs are level and at a 90 leg supports down and into the footer locations as degree angle to the base of the Bedrock Climber shown on page 4. before setting in concrete. Reference footer diagram on page 5.
Need help?
Do you have a question about the Bedrock and is the answer not in the manual?
Questions and answers