Terra Bound Solutions Bedrock Installation Manuallines

Climber

Advertisement

Quick Links

Bedrock Climber

Age Group:

2-12 Years

Recommended Crew:

Minimum 1-2 People

Tools Required for Assembly:

T-30 TORX Bit
3/16" x 6" Drill Bit
Post Hole Digger / Shovel / Auger
Tape Measure
Level
High Speed 3/8" electric drill w/ clutch

Installation Time:

15 minutes – 30 minutes

Concrete Required:

1.1781 cu ft. per post
Note: Concrete must have a minimum rating of 2,500 psi and must be mixed per
manufacturers recommendation.
DATE: 4/23/2014
Installation Guideline
BEDROCK CLIMBER INSTALLATION GUIDELINES
Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bedrock and is the answer not in the manual?

Questions and answers

Summary of Contents for Terra Bound Solutions Bedrock

  • Page 1 High Speed 3/8” electric drill w/ clutch Installation Time: 15 minutes – 30 minutes Concrete Required: 1.1781 cu ft. per post Note: Concrete must have a minimum rating of 2,500 psi and must be mixed per manufacturers recommendation. DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 1...
  • Page 2 5/16” x 5” RSS 1/4” x 2-1/2” #10 x 2-1/2” 5/16” x 4” RSS 5/16” x 3-1/8” 5/16” x 2-1/2” Stainless RSS Stainless R4 Stainless Stainless RSS Stainless RSS Stainless NOT TO SCALE! DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 2...
  • Page 3 Bedrock Climber Installation Guideline Bedrock Climber DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 3...
  • Page 4 HARDWARE IS TO BE FA STENED REQUIRES PRE- DRILLING TO ENSURE PRO PER INSTALLATION AND STRUCTURAL INTEGRITY. WE ARE NOT RESPONSIBLE FOR INSTALLATION OR ST RUCTURAL ISSUES THAT ARISE FROM NOT PRE-D RILLING ATTACHMENTS. DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 4...
  • Page 5 Bedrock Climber Installation Guideline Bedrock Climber Footer This space intentionally left blank. DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 5...
  • Page 6 Bedrock Climber Installation Guideline Bedrock Climber Footer DATE: 4/23/2014 BEDROCK CLIMBER INSTALLATION GUIDELINES Page 6...
  • Page 7 Installation Guideline Bedrock Climber Assembly Ensure that the top of the bedrock (A) is flush with the top of the deck platform or Filler Block (B), pre drill through the pilot holes located in the Bedrock Climber support with a 3/16”...
  • Page 8 Once Bedrock Climber is attached swing the 2x3 Ensure that the 2x3 legs are level and at a 90 leg supports down and into the footer locations as degree angle to the base of the Bedrock Climber shown on page 4. before setting in concrete. Reference footer diagram on page 5.

Table of Contents