8 Installing the 4U60 G2 Storage Enclosure
The following chapter instructs you on how to install the 4U60 G2 Storage Enclosure.
8.1 Recommended Torque of Machined Fasteners
The following list is the recommended torque of the machined fasteners being used during replacement or
installation of 4U60 G2 Storage Enclosure components.
Table 6: Recommended Torque of Machined Fasteners
Hardware
Cable Management
Assembly
Rail Kit
8.2 Installing the Rail Kit
Required Tools
• #2 Phillips-head
screwdriver
To install the Rail Kit, do the following:
Note: The rack mount rails must be installed into a rack with upright rails ranging between 27-30 in. If
the rack mount rails are extended beyond 30 in. the cable management assembly may not fit.
1. From the rear of the rack, verify the location that the rack mount rails will be installed.
2. Unpack the rail kit and inspect it for damage or tampering.
Note: Report any damage or tampering to HGST Support at
page 10.
3. Remove the inner rail from the rack mount rails.
a) From the inside of the rail kit, press the release latch to unlock the inner rails from the rack mount rails.
Size
M4 (screw)
Captive screw
M5 (screw)
Warnings
Attention
Ensure the rack mount rails are
securely attached to the rack or location being
installed before the chassis installation procedure.
24
8
Installing the 4U60 G2 Storage Enclosure
8.1
Recommended Torque of Machined Fasteners
Torque N-m
1.12
1.12
0.78