The PFT N2V conveying pump will be a trustworthy aid, if it is operated correctly and handled with care. It is prohibited to forward this document, even excerpts, without our written authorisation.
Page 3
____________________________________________________________________________________________________________ Initial inspection after delivery An important task of all technicians delivering the PFT N2V conveying pump is the inspection of the machine settings at the end of the first spraying. The factory settings can be changed during the first operation. If these changes are not corrected in time, immediately after run-in, then operating problems can be expected.
On/off button Main current connection from site distributor Gearbox connection Permanent current socket 230 V Compressor connection Pressure control Main reversing switch _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770 D-97343 Iphofen Internet www.pft.de...
Air from compressor Air to the spraying gun Pressure control connection to the remote control socket Air safety switch type FF4-4 0.22-4 bar _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770 D-97343 Iphofen Internet www.pft.de...
Connection mortar hose – spraying gun / paint gun *If the N2 FU 400 is connected, the distributor box must be equipped with an FI safety switch sensitive to all currents. If this is not the case, a PFT intermediate distributor, type no. 00021223 can be used.
The control unit may not be removed when the power supply is switched on. In addition to this, the circuit boards may not be touched when the frequency converter is connected to the mains. _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60...
Page 12
All spare parts must comply with the technical requirements of the manufacturer. This is guaranteed for all original PFT parts. Only trained or authorised personnel should operate the machine. Clearly define all lines of responsibility for operation, equipping, service and maintenance.
Pressure The PFT N2V/N2 FU 400 pump unit should attain a pressure of at least 15 - 20 bar and a backpressure of approx. 6 - 8 bar when the machine is switched off. Checking the conveying pressure and backpressure...
Page 14
To avoid machine breakdowns and excessive wear on pump motor, pump shaft and pump, always use original PFT spare parts such as PFT rotors / PFT stators / PFT pump shafts / PFT mortar pressure hoses. These components are compatible with one another and form a single constructive unit together with the machine.
Insert blind plug (1) machine runs Control lamp (2) glows or connect remote control Open tap (1) Switch on machine using remote control (2) _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770 D-97343 Iphofen Internet www.pft.de...
Operation (1) ON Plug in blind plug (2), machine runs or connect remote control Open tap (1) Switch on the machine using remote control (2) _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770 D-97343 Iphofen Internet www.pft.de...
Page 17
(depending on the manufacturer's specifications). The PFT N2V/N2 FU 400 conveying pump can be loaded with a screw mixer (e.g. HM 2002, HM 2006, HM 22 / 24, HM 106, HM 200, HM 5, HM 6, etc.) or from ready- mixed containers.
Depressurise all mortar hoses before opening the mortar hose couplings. This can be done by changing the direction of rotation of the pump mortar. The mortar pressure gauge must show “0”. _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60...
If required, top up with motor oil 10 W 40. Otherwise the PFT N2V/N2 FU 400 conveying pump requires no maintenance. Transport Only transport the PFT N2V/N2 FU 400 secured to a Euro pallet. _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel.
___________________________________________________________________________________________________________ PFT N2V/N2 FU 400V Check list 04/2004 ___________________________________________________________________________________________________________ How can problems with the PFT N2V/N2 FU 400 be avoided or quickly rectified? Fault Cause Solution Machine does not start Operation with remote control - Power supply okay? - Correct connection to the site...
Pressure control subassembly replacement parts list..................33 N2 FU 400 gearbox subassembly with sealing unit replacement parts list............35 N2 FU 400V control box subassembly replacement parts list .................37 _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770...
Page 36
____________________________________________________________________________________________________________ PFT N2 FU 400 V N2 FU 400V frame, gearbox and sealing unit replacement parts list 04/2004 ____________________________________________________________________________________________________________ _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770 D-97343 Iphofen Internet www.pft.de _______________________________________________________________________________________...
Page 37
____________________________________________________________________________________________________________ PFT N2 FU 400 V N2 FU 400V frame, gearbox and sealing unit replacement parts list 04/2004 ____________________________________________________________________________________________________________ Item Item no. Article description 20 17 55 00 Frame cpl. F2/N2/T 2 length 885 mm 20 17 55 52 Bracket, left manifold frame T 2 E 2004 20 20 87 01 Hex screw M8 x 16 DIN 933 zinc-pl.
Page 38
____________________________________________________________________________________________________________ PFT N2 FU 400 V N2 FU 400V frame, gearbox and sealing unit replacement parts list 04/2004 ____________________________________________________________________________________________________________ _______________________________________________________________________________________ Knauf PFT GmbH & Co.KG Tel. +49 (0) 9323/31-760 Postfach 60 +49 (0) 9323/31-770 D-97343 Iphofen Internet www.pft.de _______________________________________________________________________________________...
Page 39
____________________________________________________________________________________________________________ PFT N2 FU 400 V Control box replacement parts list 04/2004 ____________________________________________________________________________________________________________ Item Item no. Article description 00 04 12 69 Empty control box housing N2 FU 400 RAL7032 400 x 400 x 210 mm 20 41 90 70 Fine fuse 5 x 30, 0.5 A...
PFT N2V/N2 FU 400V Suggested tests for open conveying pumps, e.g. SWING, N2, ZP3 Inspector: ________________________________________ Type: ___________________________ Date of inspection: ________ Signed:____________________ Serial no.: ___________________________ Subassembly Component Condition Mainte- Function Remarks Visual nance inspection required Frame Material hopper /...
Page 42
PFT N2V/N2 FU 400V Suggested tests for open conveying pumps, e.g. SWING, N2, ZP3 Inspector: ________________________________________ Type: ___________________________ Date of inspection: ________ Signed:____________________ Serial no.: ___________________________ Subassembly Component Condition Mainte- Function Remarks Visual nance inspection required Control box condition Control box...
Page 43
PFT N2V/N2 FU 400V Suggested tests for open conveying pumps, e.g. SWING, N2, ZP3 Inspector: ________________________________________ Type: ___________________________ Date of inspection: ________ Signed:____________________ Serial no.: ___________________________ Subassembly Component Condition Mainte- Function Remarks Visual nance inspection required Power cable Accessories Mortar pressure hoses...