Electric Wiring - Toshiba Carrier MMY-MAP0726FT9P-UL Installation Manual

Table of Contents

Advertisement

1. All service valves on the outdoor units should remain fully closed.
2. R410A refrigerant should be added (in liquid state) at the liquid line service port on the header unit.
3. If the calculated amount of refrigerant can added to the system, the charging process is finished.
4. If the total calculated amount of refrigerant cannot be added to the system, close the valve on the refrigerant
bottle, move the charging hose from the liquid line service port to the suction line service port.
5. Open the suction and liquid service valves on the header unit and start the system in cooling mode.
6. Slowly open the valve on the refrigerant bottle and carefully release liquid refrigerant into the suction service
port.
7. If the total calculated charge amount is added completely to the system, the charging process is finished.
■ Full opening of the valve
Open the valves of the outdoor unit fully.
MAP072
Packed valve
Balance pipe
Using a 4 mm-hexagonal wrench, fully open the valve shaft.
Ø1/2" packed valve
Using a 4 mm-hexagonal wrench, fully open the
valve shaft.
Liquid side
Ball valve
Using a flathead screwdriver, turn it counterclockwise by 90° until it hits the stopper. (Full open)
Service port
Discharge gas
side
(1)
(2)
Ball valve
Using a wrench, turn the valve shaft counterclockwise by 90° until it hits the stopper. (Full open)
Suction gas side
31-EN
MAP096
MAP120
MAP144
MAP168
Ø5/8" packed valve
Using a 5 mm-hexagonal wrench, fully open the
valve shaft.
Position of screwdriver slot
Fully closed
Valve unit
Using flathead screwdriver, turn
it counterclockwise by 90° until
it hits the stopper. (Full open)
Slot
* When opened fully, do not apply excessive
Flare nut
torque after the screwdriver hits the stopper;
otherwise a problem may be caused on the
valve. (3.7 ft•lbs (5 N•m) or less)
Fully closed
■ Pipe insulation
• Apply pipe insulation separately to liquid, gas, and balance lines.
• All insulation should have a minimum temperature rating of 248°F (120°C).
■ Finishing pipe work
1. After all piping and insulation is complete. Fill the remaining gap at the piping panel with silicon sealer.
2. If the piping was routed down or to the side, the remaining gap should be filled with silicon sealer.
When not using the piping cover
Piping/wiring panel
Pipe routed to front
8

Electric wiring

WARNING
The equipment shall be installed in compliance with NEC and local codes.
Fully opened
CAUTION
• Do not connect high voltage power wires to the control terminal blocks (U1, U2, U3, U4, U5, U6);
• All fi eld wiring insulation rating must comply with NEC and local codes.
• All wiring must be strained relieved as specifi ed by NEC and local codes.
• Refrigerant piping and control wiring should use the same routing.
• Do not energize the indoor units until leak check and vacuuming are completed.
• For indoor unit power and control wiring see indoor unit installation instructions.
NOTE
• Use copper supply wires.
• Use UL wires rated 600V for the system interconnection wires.
• Use UL wires rated 300V for remote control wires.
Fully opened
– 16 –
Pipe routed to side
Fill space with silicon sealer
Pipe routed down
EN
FR
32-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents