Hussmann XR75CX Installation & Operation Manual page 20

Table of Contents

Advertisement

I
1-16
nstallatIon
5. Install mullions onto Support Rail. Angle
the mullion toward inside of the case and
engage the flange in the extrusion (Step
1). Straighten mullion (Step 2).
NOTE:
End mullions are thinner than center
mullions.
6. Slide top flange on mullion through slot
in canopy support. Attach with screw.
Repeat for all center and end mullions.
P/N 3143042_B
- INSTALL MULLION
- Angle Mullion toward inside of case and engage the flange in the extrusion(Step #1)
- Straighten mullion as in step #2.
Mullion
Flange
Mullion Flange
Mullion Flange
Canopy
Canopy
Support
Support
Canopy
Support
U.S. & Canada 1-800-922-1919 • Mexico 800-890-2900 • WWW.HUSSMANN.COM
Step #1
Slide top flange on mullion thru slot in canopy support.
Attach with screw .
Repeat for Right Mullion and center mullion.
The end mullion are Thinner than the center mullions
Slide top flange on mullion thru slot in canopy support.
Attach with screw .
Repeat for Right Mullion and center mullion.
The end mullion are Thinner than the center mullions
Step #2
Screw
Screw
Screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

EgpEgpf merchandisers

Table of Contents