Option For Tents With Side Pulls - DAS company P50 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

STEP 4
Add corner foot to the construction of the tent (No.6) diagonally and the feet (No.7) also diagonally. On the sides of the tent put feet (No.8)
and connect them with pipes (No.2) for tents with uneven length for example: 9m, 11m, 13m, etc. in the third section, install the pipe
extending by 1m (No.3). Then, on the front and back of the tent install feet (No. 9) and connect them with corner feet using a pipe (no.45).
Attach feet of the tent to the ground firmly.
2
8
7
85
9
STEP 5
Connect pipe (No.1) and pipe
(no.86), when it is ready connect
it with feet (No.9) and connectors
(No.4). Connection with
connectors (No.4) must be
installed outside the tent.
In every two segments, install side pulls on both sides of the construction every two fields (4m) forming the letter X. Starting with the
connector (no.A2) and foot (No.6), on the other side starting with the connector (No.A1) and foot (No.7). All side pulls should be mounted
on the outside of the tent.
2
8
8
2 or 3
9
85
6
86
1

Option for tents with side pulls

A1
7
2
2
2
6
8
8
2
8
4
9
9
85
9
8
2
8
2 or 3
A2
6
9
7
2
8
8

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for DAS company P50

Table of Contents