Table Of Elements For Height; Option For Tents 2,5M Or 3M Long - DAS company P50 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

3
STEP

Table of elements for height

Elements
Height
2m
nr.1
2,5m
nr.1 + nr.19
3m
nr.1 + nr.20
Gently raise the tent on its one side and mount pipes (no.1) . Three symmetrical holes in pipe should be faced down.
Then lift the tent on the other side and repeat the step.
3/a
STEP
Lift the tent on one side with fixed pipes (No.1), then add pipes extending for 0,5 m (No.19) for 2,5m long tent, or pipes
extending for 1m (No.20) for 3m long tent. Then lift the tent on the other side and repeat.
1
19 or 20
3/b
STEP
Lift the tent on one side with fixed pipes (No.1), then add pipes extending for 0,5 m (No.19) for 2,5m long tent,
or pipes extending for 1m (No.20) for 3m long tent. Then lift the tent on the other side and repeat.
1
19 or 20
19 or 20
19 or 20
(Picture no.1)
(Picture no.2)
(Picture no.2)
(Picture no.1)

Option for tents 2,5m or 3m long

(Picture no.2)
Option for tents 2,5m or 3m long
Table of elements for height
Height
3,5m
4m
(Picture no.3)
Elements
nr.1 + nr.20 + nr.19
nr.1 + nr.20 + nr.20
(Picture no.3)
(Picture no.3)
1
19 or 20
1
19 or 20
19 or 20
19 or 20

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for DAS company P50

Table of Contents