Option For Tents With Roof Pulls - DAS company P50 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Tent installation instructions
3
KROK
A4/A5
10
84
Ready-made structure should look like in
3
the picture.
84
A2
A1
On every two segments (4m) roof pulls should be installed on
both sides of the structure (n o .6 8 ) forming the letter X.
Starting from the connector (n o .A 4 ) and (n o .A 2 ) All roof
pulls should be mounted above the roof construction.
A1
Tent 8m type P50
Connect the roof connectors (n o .A 4 ) and (n o .A 5 )
1
with horizontal cantilevers (n o .1 0 ) using M6x35
screws.
A4/A5
81
82
83
84
81
82
83
84
A2

Option for tents with roof pulls

STEP 2/a
81
A2/A3
A3
2
81
2
A2
A5
A5
A4
88
Connect the horizontal cantilevers (no.84) zwith
2
phorizontal cantilevers (no.83) using M6x35
screws.
The resultant element of connection, attach to the
bottom of connectors (no.A2 lub no.A3)
And the middle of the resulting element connect
with the horizontal bar (no.10) by the vertical
connector (no.82)
A3
2
A3
A3
A 3
90'
A 3
A3
A3
A3
A2

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for DAS company P50

Table of Contents