TYAN TS65-B7120 Service Engineer's Manual page 47

Table of Contents

Advertisement

6.
To secure the heatsink assembly, use a T30 Security Torx to tighten the
screws in a sequential order (1234).
NOTE:
When disassembling the heatsink, loosen the screws in reverse order
(4321).
7.
Repeat the procedures described earlier to install the second processor and
heatsink.
8.
Place the air duct on top of the heatsink and screw it to the chassis.
47
http://www.tyan.com

Advertisement

Table of Contents
loading

Table of Contents