Download Print this page

MATE MTH-16 Usage Instructions page 8

Advertisement

ALIGNMENT PROCEDURE (CONT.)
12.
Remove the Alignment Bar while still at the active punching station.
13a. Lift up the Alignment Punch while sliding in a piece
of metal on top of Die or Die Carrier and under the
Alignment Punch to disengage tools.
WARNING: It is very important that the tools are NOT
engaged when rotating the turret. Damage to the
Alignment Tool and/or turret is possible.
13b. Lower alignment punch to rest on piece of metal.
14.
Disengage turret locking pins.
15a. Rotate machine to the tool change position
and tighten all upper flange bolts to a torque
of 40 N-m, 29.5 ft-lbf or 354 in-lbf.
15b. Rotate machine to the tool change position
and tighten all lower flange bolts to a torque
of 40 N-m, 29.5 ft-lbf or 354 in-lbf.
Mate Precision Technologies • 1295 Lund Boulevard • Anoka, Minnesota 55303 USA • Phone +1.763.421.0230 • 800.328.4492 • Fax +1.763.421.0285 • 800.541.0285
The Mate Logo is a registered trademark of Mate Precision Technologies Inc.
© Mate Precison Technologies Inc.
MATE 2-PIN LINE UP TOOL
USAGE INSTRUCTIONS
Step 13a
Steps 15a
Dimensions in Inches(millimeters)
Step 12
Step 13b
Steps 15b
mate.com
LIT01233 Rev B

Advertisement

loading